Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work, paving, outdoor lighting and renovation of a mixed-use development in Heflin, Alabama. Completed plans call for the renovation of a clubhouse / community center; for site work for a road / highway; for paving for a road / highway; water / sewer project; and for outdoor lighting for a road / highway.
Cleburne County Contract Time: January 1, 2027 Completion Date DBE Goal Percent:0.50 for constructing the Welcome Center Renovations (Grading, Drainage, Utility Installation, Lighting Installation), Resurfacing (Scrub Seal), and Traffic Stripe on I-20 near the Georgia State Line. Length 0.655 mi. The Bracket Estimate on this project is from $7,707,852 to $9,420,708 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 004 - Welcome Center Renovations (Grading, Drainage, Utility Installation, Lighting Installation), Resurfacing (Scrub Seal), and Traffic Stripe on I-20 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Clubhouse / Community Centers
$11,958,683.00
Public - State/Provincial
Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
May 27, 2025
I-20, Heflin, AL
Related To This Project
Heflin, AL
Bid Date: May 06 2025
Heflin, AL
Bid Date: Apr 16 2025
Heflin, AL
Bid Date: May 06 2025
Heflin, AL
Bid Date: Aug 20 2025
Heflin, AL
Bid Date: Aug 29 2025
Heflin, AL
Bid Date: Aug 29 2025
Heflin, AL
Bid Date: Oct 08 2025
Heflin, AL
Bid Date: Jan 14 2026
Heflin, AL
Bid Date: Feb 27 2025
Heflin, AL
Bid Date: Nov 21 2024
Heflin, AL
Bid Date: Jan 13 2026
Heflin, AL
--
Heflin, AL
--
Annual In-Place Plant Mix Annual Bituminous Treatment Resurfacing Annual Traffic Striping, - 5496301
Heflin, AL
Bid Date: Aug 21 2024
Heflin, AL
Bid Date: Jan 04 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
