BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Site work for a civil project in Toledo, Ohio. Working plans call for site work for a water / sewer project; and road / highway.

The City of Toledo (COT) is requesting Qualifications Statements for prequalification of a prime contractor to construct the Division of Water Treatment Distribution System Improvements - Phase 1 and Phase 2 Projects which is included in the City of Toledo's Water Capital Improvement Program. The purpose of this project is to provide elevated water storage and water supply in the event of a High Service Pumping Station outage and provide boosted water distribution pressures in the northwesterly part of the City. The major project components are located at five locations throughout the City and Lucas County and are as follows: - Northover Pumping Station and 2 - 2 MG Elevated Storage Tanks - 2 MG Schneider Elevated Tank and approximately 600 LF 30" Water Main - 2 MG Holland Sylvania Elevated Tank - Bancroft Street Boundary Structure - Byrne Road Boundary Structure The facilities will be owned and operated by the COT. Question Deadline 04/04/2025 at 4:00 PM ET Questions must be submitted thru online. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Type of Award Lump Sum PROJECTDESCRIPTION The Work will be performed under a competitively bid prime Contract and will consist of providing all plant, labor, materials and equipment and performing all operations required for the complete construction of the Distribution System Improvements - Phase 1 and Phase 2 Projects, including, but not limited to: The Elevated Storage Tanks and Pumping Station - Phase 1 project consists of: o 2 - 2 MG elevated storage tanks o A 29 MGD pumping station inside the two tank bases Two horizontal split case pumps in each tank base Pump controls located on second floor Two packaged diesel generators in housed enclosures o Bancroft Street and Byrne Road boundary zone control structures Each subgrade valve control structure has a pressure reducing valve, check valve, isolation valves, electrical service and miscellaneous appurtenances. o There is an interim substantial completion date for 1 - 2 MG elevated storage tank connected to distributions system The Elevated Storage Tanks - Phase 2 project consists of: o 2 MG Schneider Park elevated storage tank o 2 MG Holland Sylvania elevated storage tank o Approximately 600 LF of 30" water main. Shortlist Confirmed.

Final Planning

Water / Sewer

$4,000,000.00

Public - City

Site Work

4

7

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
139
Bidding Soon
2,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

Multiple Locations, Toledo, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.