Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Site work for a civil project in Toledo, Ohio. Working plans call for site work for a water / sewer project; and road / highway.
The City of Toledo (COT) is requesting Qualifications Statements for prequalification of a prime contractor to construct the Division of Water Treatment Distribution System Improvements - Phase 1 and Phase 2 Projects which is included in the City of Toledo's Water Capital Improvement Program. The purpose of this project is to provide elevated water storage and water supply in the event of a High Service Pumping Station outage and provide boosted water distribution pressures in the northwesterly part of the City. The major project components are located at five locations throughout the City and Lucas County and are as follows: - Northover Pumping Station and 2 - 2 MG Elevated Storage Tanks - 2 MG Schneider Elevated Tank and approximately 600 LF 30" Water Main - 2 MG Holland Sylvania Elevated Tank - Bancroft Street Boundary Structure - Byrne Road Boundary Structure The facilities will be owned and operated by the COT. Question Deadline 04/04/2025 at 4:00 PM ET Questions must be submitted thru online. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Type of Award Lump Sum PROJECTDESCRIPTION The Work will be performed under a competitively bid prime Contract and will consist of providing all plant, labor, materials and equipment and performing all operations required for the complete construction of the Distribution System Improvements - Phase 1 and Phase 2 Projects, including, but not limited to: The Elevated Storage Tanks and Pumping Station - Phase 1 project consists of: o 2 - 2 MG elevated storage tanks o A 29 MGD pumping station inside the two tank bases Two horizontal split case pumps in each tank base Pump controls located on second floor Two packaged diesel generators in housed enclosures o Bancroft Street and Byrne Road boundary zone control structures Each subgrade valve control structure has a pressure reducing valve, check valve, isolation valves, electrical service and miscellaneous appurtenances. o There is an interim substantial completion date for 1 - 2 MG elevated storage tank connected to distributions system The Elevated Storage Tanks - Phase 2 project consists of: o 2 MG Schneider Park elevated storage tank o 2 MG Holland Sylvania elevated storage tank o Approximately 600 LF of 30" water main. Shortlist Confirmed.
Final Planning
Water / Sewer
$4,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
May 15, 2025
Multiple Locations, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Mar 25 2025
Toledo, OH
Bid Date: Mar 28 2025
Toledo, OH
Bid Date: Apr 01 2025
Toledo, OH
Bid Date: Jul 02 2019
Toledo, OH
Bid Date: Apr 08 2025
Toledo, OH
Bid Date: Apr 15 2025
Toledo, OH
--
Toledo, OH
Bid Date: Apr 29 2025
Toledo, OH
Bid Date: May 20 2025
Toledo, OH
Bid Date: Mar 18 2025
Toledo, OH
Bid Date: Mar 18 2025
Toledo, OH
Bid Date: Mar 25 2025
Toledo, OH
Bid Date: Mar 18 2025
Toledo, OH
Bid Date: Mar 28 2025
Toledo, OH
Bid Date: Apr 01 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed