Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 7, 2026

Site work and new construction of a museum in Austin, Texas. Working plans call for the construction of a 30,000-square-foot, four-story above grade museum; and for site work for a museum.

As of October 2, 2026, a construction manager at risk has been selected for the project. Construction funding is expected to come from the 2026 Bond and is expected to go for ballot in November of 2026. A firm timeline for construction has not been disclosed. The existing 3-story Mexic-Arte Museum will be demolished and construct of an approximately 30,000 square feet, 4-story museum with functional first floor including, but not limited to, an entrance lobby, giftshop, loading area, gallery, and the required circulation and service spaces on the first floor. African American 3.24% Hispanic American 3.25% Native/Asian American 2.89% WBE 4.76% The City of Austin (City), hereafter referred to as Owner, desires to select a Construction Manager-at-Risk firm through a one-step evaluation and selection process. This solicitation complies with applicable City Policy and state of Texas law, including Texas Government Code Title 10, Subtitle F, Chapter 2269. Owner will select the successful Offeror that offers the best value to the City based on the published Evaluation Criteria. Owner will evaluate and rank each responsive submittal with respect to the published Evaluation Criteria contained in this solicitation expeditiously. Owner may determine that it is necessary to interview Offerors prior to making a recommendation to the City Council. The project budget is currently Thirteen Million Dollars ($13,000,000). The project is located in downtown Austin and the site encompasses the existing 3-story MexicArte Museum that will be demolished and construct of an approximately 30,000 square feet, 4- story museum with functional first floor including, but not limited to, an entrance lobby, giftshop, loading area, gallery, and the required circulation and service spaces on the first floor. The Construction Manager at Risk (CMR) will be brought on early in the design phase for preconstruction services, such as design-phase cost control, constructability reviews, and construction phase services. The Construction Manager-at-Risk and the Design Consultant are both required to work together to recommend scope achievable with the available funding and schedule. The final selection of the CMR firm for this project is anticipated to be completed and submitted to the Austin City Council for action by June, 2025. There will be no site visit.

Pre-Construction/Negotiated

Museum

$14,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
125
Bidding Soon
2,896
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

March 1, 2027

Project location map

419 Congress Ave., Austin, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed