BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

Project: Wheless Townhomes Offsite Located at: 1512 Wheless Lane Austin, Texas 78723 Maintenance Bond: If the Contract Documents contemplate a period of maintenance beyond the one (1) year contractual warranty period, OWNER agrees that any bond to be required for such maintenance work will be in the amount of the maintenance work during any extended maintenance period. The Work consists of the construction of approximately 725 linear feet of 24-inch wastewater interceptor pipe and 40 linear feet of 8-inch water main and appurtenances along Brookside Drive. The result of the bid opening does not become final until all bids are verified, and the bid tab is certified. The pencil bid tab and certified bid tab will be posted online. All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders. Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Contract Time is of the essence and all Work shall be substantially completed within One Hundred and Eighty (180) Calendar Days after date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300. Final completion shall be achieved within Sixty (60) Calendar Days after substantial completion. Liquidated damages are Six Hundred and Forty dollars ($640.00) per Calendar Day for failure to substantially complete the work and Three Hundred and Forty dollars ($340.00) per Calendar Day for failure to achieve final completion within Sixty (60) Calendar Days after substantial completion, in accordance with the Bid Form, Section 00300. OWNER reserves the right to reject any or all Bids and to waive any minor informality in any Bid or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Bid). A non-mandatory Pre-Bid Conference will be held via webinar and teleconference. For those calling in, please send an email to steven.cocke@austintexas.gov with the subject line , indicate in the body of the email your name, the firm you are representing, your contact information and whether you are a prime firm or subcontractor. Please send this by 5:00 pm on the day of the virtual pre-bid meeting. Question Deadline 03/18/2025 Prospective Bidders desiring further information or interpretation of Project Manual or Drawings must make a written request for such information to OWNER addressed to the Authorized Contact Person listed in Section 00020 no later than seven (7) Working Days before Bid opening. Interpretation of Project Manual or Drawings will be made by Addendum only and obtained through online.

Post-Bid

Water / Sewer

$737,000.00

Public - City

Site Work

51

36

2

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
76
Bidding Soon
2,802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

Project location map

1512 Wheless Ln, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.