BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Site work for a water / sewer project in Eustis, Florida. Completed plans call for site work for a water / sewer project.

The deadline for questions shall be 5:00 pm on March 21, 2025. SUMMARY The Work outlined herein includes the installation of a bypass connection from the City of Eustis’ Lift Station 24 to the Umatilla Force Main. This bypass will enable the flow from Lift Station 24 to be redirected from the existing 8-inch PVC force main located along the south side of CR 44, to existing 16-inch force main on the north side of CR 44. The existing 8-inch force main will be valved off to the east of the bypass connection point. Both ends of the bypass connection will be located outside of the right-of-way of CR 44.

Bid Results

Water / Sewer

$381,150.00

Public - City

Site Work

8

14

8

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
182
Bidding Soon
2,529
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.