Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 21, 2025
Site work, paving and outdoor lighting for a mixed-use development in Lakeland, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Work consists of providing all labor, materials, equipment and incidentals necessary for mainline and ramp new construction, shared use path new construction, widening, milling and resurfacing, bridges, walls, drainage improvements, guardrail placement, curb and gutter, sidewalk, signing and pavement markings, signal improvements, intelligent transportation systems, lighting improvements, and toll facility construction on the Central Polk Parkway (SR 570B) from MP 5.993 to MP 8.522 in Polk County. Contractor must be prequalified. Counties: Polk Road Name: Central Polk Parkway - From Us 17 (Sr 35) to Sr 60 Limits: 16471000 Project(s): 44089735201(*) Federal Aid No: N/A Total Roadway Length: 3.000 Miles Total Bridge Length: 0.929 Miles Total Proposal Length: 3.929 Miles Contract Days: 1669 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Please read the full advertisement Description: Work consists of providing all labor, materials, equipment and incidentals necessary for mainline and ramp new construction, shared use path new construction, widening, milling and resurfacing, bridges, walls, drainage improvements, guardrail placement, curb and gutter, sidewalk, signing and pavement markings, signal improvements, intelligent transportation systems, lighting improvements, and toll facility construction on the Central Polk Parkway (SR 570B) from MP 5.993 to MP 8.522 in Polk County. Contractor must be prequalified. 3D Model (Signed and Sealed Document) This project serves as a pilot project for the use of the 3D model (signed and sealed document) and for automated machine guidance (AMG). As such, modified special provisions (MSPs) have been developed that define the requirements for AMG on this project. Furthermore, certain information is only available from the digital design files, which must be obtained from the native MicroStation .dgn files or through the use of a digital design review platform. The Department is making one such platform (Bentley iTwin) available for use at no cost to bidders during the bid period. Instructions for gaining access to the 3D model via iTwin, along with a link to a video training, is included in the Contract Documents. Additional information regarding the use of the 3D model and a digital design review platform will be provided during the non-mandatory pre-bid meeting. Question Deadline 04/25/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Milling and Resurfacing - Central Polk Parkway Ifyou have any questions regarding this information, please do not hesitate to contact Rich Nethercote at 407-264-3885.
Award
Roads / Highways
$134,480,570.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
July 31, 2025
Polk Pkwy, Lakeland, FL
Related To This Project
Lakeland, FL
Bid Date: Mar 27 2025
Lakeland, FL
Bid Date: Mar 25 2025
Lakeland, FL
Bid Date: Apr 17 2025
Lakeland, FL
Bid Date: Apr 16 2025
Lakeland, FL
Bid Date: Apr 04 2025
Lakeland, FL
--
Lakeland, FL
Bid Date: May 02 2025
Lakeland, FL
Bid Date: Mar 13 2025
Lakeland, FL
Bid Date: Mar 20 2025
Lakeland, FL
Bid Date: Mar 11 2025
Lakeland, FL
Bid Date: Mar 31 2025
Lakeland, FL
--
Lakeland, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
