BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Site work and paving for a mixed-use development in Rochester, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Said Construction generally consists of Sanitary Sewer Reconstruction .The Work Includes the Following Approximate Quantities of Work: Item Description Units Quantity 2021.501 Mobilization Lump Sum 1 2101.502 Clearing Each 4 2101.502 Grubbing Each 4 2104.502 Remove Manhole Each 5 2104.503 Remove Sewer Pipe (Sanitary) Lin Ft 1050 2104.503 Remove Fence Lin Ft 10 2104.504 Remove Bituminous Pavement Sq Yd 200 2104.603 Abandon Pipe Sewer Lin Ft 340 2106.507 Common Embankment (Cv) Cu Yd 500 2211.507 Aggregate Base (Cv) Class 5 Cu Yd 40 2503.503 8" Pvc Pipe Sewer Lin Ft 112 2503.503 12" Pvc Pipe Sewer Lin Ft 1632 2503.601 Sewer Bypass Pumping Lump Sum 1 2521.518 3" Bituminous Walk Sq Ft 1700 2573.503 Silt Fence; Type Ms Lin Ft 1200 S100.514 Furnish & Install 2 in Polystyrene Insulation Sq Ft 2000 S100.545 Construct Structure Type 3 Each 8 S100.551 Furnish & Install 8 in X 8 Wye Each 1 S100.558 Furnish & Install 8 in Plug Each 3 S100.572 Connect Into Existing Sanitary Sewer Each 2. Each bid must be accompanied by a cash deposit, bid bond, cashier's check or a certified check payable to the City of Rochester, Minnesota, for at least 5% the amount of the bid, which amount shall be forfeited to the City of Rochester, Minnesota, as liquidated damages if the bidder, upon the letting of the contract to them shall fail to enter into the contract so let; the Common Council reserving the right to reject any and all bids. The Common Council will consider the bids in the Council/Board Chambers at the Government Center at 6:00 P.M. on April 7, 2025 . Direct questions about this Project, including pre-bid questions, to: Project Engineer Brett Voth 952-905-2879 brett.voth@kimley-horn.com Project Design Engineer Vince Barker 612-503-8526 vincent.barker@kimley-horn.com LINK BRT Project Coordinator Josh DeFrang 612-503-8526 vincent.barker@kimley-horn.com

Bid Results

Sidewalks / Parking Lot

$204,438.00

Public - City

Paving, Site Work

20

5

17

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
118
Bidding Soon
1,448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 14, 2025

Project location map

Multiple Locations, Rochester, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.