BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work and paving for a road / highway in Oil City, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project is the construction of 0.59 miles of state highway in Erie County from SR 0090 Segment 0160 Offset 1780 to SR 0090 Segment 0161 Offset 2619 and SR 0090 Segment 0394 Offset 2301 to SR 0090 Segment 0401 Offset 0185, in Mercer County from SR 0080 Segment 0254 Offset 2115 to SR 0080 Segment 0255 Offset 2603, and in Venango County from SR 0008 Segment 0060 Offset 0410 to SR 0008 Segment 0071 Offset 1003 and SR 0080 Segment 0294 Offset 2540 to SR 0080 Segment 0301 Offset 0152, including guide rail improvements, ITS devices and structures, and delineation as indicated on the approved drawings included in the Bid Package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Penndot Oversight Nhs Structure Work: 0.00% Pre-Bid Meeting: None Anticipated NTP: 05/12/2025 Wage Rates: Yes Required Completion: 01/25/2027 Prequalification Requirement: Yes State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PADOT: I-80 Venango Co ITS Add at Barkeyville - TSMO --This work is: Removal of organic matter within excavation areas and removal of the first 8 inches of topsoil and organic matter within embankment areas. Removal of organic matter such as all trees, stumps, brush, roots, and other vegetation within the limits of excavation and embankment areas, including ditches and channels. When indicated, perform tree trimming and selective tree removal outside of the limits of excavation and embankment areas as specified in Section 810. Removal of objectionable material, rubbish, and junk within the project limits. Removal of buildings and structures, fences, walls, guide rail posts, guide rails, signs, direction markers, and other obstructions interfering with the work that are not included in other contract items. Disposal of removed material. Salvaging, temporarily storing, and delivering of material. Obtaining of waste areas for disposal of material as specified in Section 105.14. Stockpiling of topsoil and topsoil mixture as specified in Section 801. Chipping and stockpiling wood waste material, if specified in the Special Provisions.

Award

Roads / Highways

$1,431,397.00

Public - State/Provincial

Paving, Site Work

23

9

25

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
104
Bidding Soon
1,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 12, 2025

Project location map

Multiple Locations, Oil City, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.