BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 29, 2025

Site work and outdoor lighting for a road / highway in Fort Myers, Florida. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Light Poles, Fixtures and Globes Question Deadline 03/23/2025 at 2:00 PM ET All questions regarding the meaning or intent of the solicitation documents must be submitted through the OpenGov Portal. PROJECT DETAILS / SCOPE OF WORK 3.1. Mandatory Minimum Qualifications 1. The Respondent(s) shall hold any necessary license's authorizing them to do business in the State of Florida. 2. Respondent(s) shall have been in business under the current company/firm name for a minimum of three (3) consecutive years. 3. Neither Respondent nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the City, (as a party to a contract, or otherwise); nor have failed to perform faithfully on any previous contract with the City. 4. Respondents are required to inform the City of any relevant legal or ethical issues. Specifically, they need to disclose: o Judgments: Any court decisions against them. o Pending Lawsuits: Any legal actions that are currently underway. o Criminal Activities: Any criminal conduct, especially if it involves moral turpitude (actions that are morally reprehensible). Respondents will be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context. To demonstrate qualifications to perform the Work, each Respondent must be prepared to submit written evidence, such as financial data, previous experience, present commitments, and other such data as may be called for. Each Solicitation must contain evidence of the Respondent's qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract. The awardee will be required to maintain the Minimum Qualifications Requirements, as presented during selection, if selected and awarded the contract, during the term of the Contract and any contract renewals. 3.2. Scope of Work for Light Poles, Fixtures, and Globes The City of Fort Myers, Florida, is seeking qualified vendors to provide light poles, fixtures, and globes for installation in various locations throughout the city that were destroyed by Hurricane Milton and Hurricane Helene. The objective of this procurement is to ensure the effective illumination of public areas, enhance safety, and improve the aesthetic appeal of the city. The selected vendor will be responsible for supplying high-quality products that comply with all relevant standards and regulations, including local, state, and federal guidelines. This scope of work outlines the specifications, service requirements, and delivery requirements for this procurement to ensure that the City receives the best possible solutions for its lighting needs.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
63
Bidding Soon
989
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

Multiple Locations, Fort Myers, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.