BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work for a playground / park / athletic field in San Diego, California. Completed plans call for site work for a playground / park / athletic field.

Turf Field Replacement at Dana Middle School. CSLB License Required - A Location 1775 Chatsworth Boulevard, San Diego CA 92107 Under Public Contract Code section 20111(b)(1), bids shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and a surety company or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of the bid value. Bids may not be withdrawn by any bidder for a period of ninety (90) days after the electronic opening of bids. During this time, bidders shall guarantee prices quoted in their respective bid submissions. A successful bidder shall not be relieved of the bid submitted without the District's consent or bidder's recourse to Public Contract Code 5100 et seq. For information regarding bidding, please email mjuarez@sandi.net. Prime contractors or any subcontractor performing the license classifications of A, B [if performing the work of] C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46 wishing to submit a bid to a bidding prime contractor must be prequalified in order to bid. Pursuant to a board-approved resolution, the Bidder is required to satisfy a minimum DVB participation percentage of at least three percent (3%) for this project. Document Note: If Bid and Contract Documents, including addenda, are returned intact and in good order to Crisp Imaging within ten (10) days of the issuance of the Final Bid Tabulation, the check will be returned. The project estimate is between $2.9 million and $3.2 million, inclusive of allowances. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Removal and replacement of existing field turf. Remove trees and roots that are invading the field, replace aggregate base, membrane and flat drains in areas roots have damaged existing. The RFI response deadline is Wednesday, March 19, 2025, by 3:00 p.m. Questions pertaining to this bid should be addressed to: Marie Juarez, Contract Specialist, Construction San Diego Unified School District Facilities Planning and Construction 2351 Cardinal Lane, Bldg. M San Diego, CA 92123 (858) 522-5835 mjuarez@sandi.net If you have questions regarding this bid or the revisions, please contact me at mjuarez@sandi.net.

Award

Playgrounds / Parks / Athletic Fields

$1,862,027.00

Public - City

Site Work

16

20

9

11

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
100
Bidding Soon
1,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 14, 2025

Project location map

1775 Chatsworth Blvd, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.