Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 10, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Highland Park, Michigan. Completed plans call for site work for a water / sewer project.
Replacement of existing cast-iron watermain, with approximately 42,820 linear feet of new C900 pipe with diameter sizes of 6-inch, 8-inch, and 12-inch. The project will be divided into four (4) phases. Phase 1 involves replacement of existing cast-iron watermain along Beresford Street, Winona Street, E. Buena Vista Street, Farrand Park, McLean Street, Colorado Street, Rhode Island Street, Massachusetts Street, California Street, and Connecticut Street, with new C900 pipe, approximately 77 linear feet of 6-inch and 1,188 linear feet of 8-inch diameter watermain by method of Open Cut, and approximately 22,574 linear feet of 8-inch diameter watermain by method of Horizontal Directional Drilling (HDD) method. This phase will also include replacement of approximately 784 lead service lines and meter replacement at each service address. Phase 2 involves replacement of existing cast-iron watermain Glendale Street, and McLean St., with new C900 pipe, approximately 276 linear feet of 12-inch diameter watermain by method of Open Cut method, and approximately 5,236 linear feet of 12-inch diameter watermain by method of HDD. Phase 3 involves replacement of existing cast-iron watermain along Second Avenue & Third Avenue, with new C900 pipe, approximately 150 linear feet of 12-inch diameter watermain by method of Open Cut, and approximately 2,836 linear feet of 12-inch diameter watermain by method of HDD. This phase will also include replacement of approximately 264 lead service lines and meter replacement at each service address. Phase 4 involves replacement of existing cast-iron watermain along Waverly Street, Tyler Street, W. Buena Vista Street, and Avalon Street, with new C900 pipe, approximately 82 linear feet of 6-inch, and 520 linear feet of 8-inch, diameter watermain by method of Open Cut, and approximately 9,883 linear feet of 8-inch diameter watermain by method of HDD. This phase will also include replacement of approximately 5 lead service lines and meter replacement at each service address. Project will be divided into four (4) phases and bidders may bid on one (1) or multiple phases. Bidder may be awarded one (1) phase or multiple phases. Considering the funding source requirements, time is of the essence for this project. If a bidder is awarded multiple phases, it will be the bidder's responsibility to ensure required manpower and resources are dedicated to this project such that the phases are completed in the contract project time. This project is funded by the Drinking Water State Revolving Fund (DWSRF) through the American Rescue Plan (ARP), and as such, the Contract will be subject to and Contractor will be responsible for complying with the Davis-Bacon Prevailing Wage Requirements, Iran Sanctions Act, Debarment and Suspension Certification Requirements, and also EGLE regulatory guidelines for lead line replacements as necessary. Build America Buy America (BABA) and American Iron & Steel (AIS) are encouraged but not a requirement. The successful bidder will be required to furnish satisfactory performance, labor, and materials and maintenance and guarantee bonds in the amount of one hundred percent (100%) of the Contract price. The total duration of the project is not to exceed 15 months in duration from the start of the project period. Start of project is tentatively April 24, 2025 and Final completion of the project is tentatively July 31, 2026. Wages: Davis Bacon/Prevailing Wages Doc Notes: Contractors must send an email requesting hard copies at least 24 hours in advance. Additional copies may be obtained at cost per copy. All qualified vendors are encouraged to bid on all City of Highland Park construction projects. Anticipated Award Date: April 21, 2025
GC Bidding
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
April 24, 2025
Multiple Locations, Highland Park, MI
Related To This Project
Highland Park, MI
Bid Date: Mar 28 2025
Highland Park, MI
Bid Date: Dec 13 2024
Highland Park, MI
--
Highland Park, MI
--
Highland Park, MI
Bid Date: Aug 07 2024
Highland Park, MI
Bid Date: Aug 14 2024
Highland Park, MI
Bid Date: May 15 2024
Highland Park, MI
Bid Date: Mar 27 2024
Highland Park, MI
Bid Date: Mar 27 2024
Highland Park, MI
Bid Date: Mar 27 2024
Highland Park, MI
Bid Date: Mar 27 2024
Highland Park, MI
Bid Date: Mar 27 2024
Highland Park, MI
Bid Date: Apr 05 2024
Highland Park, MI
Bid Date: Jan 05 2024
Highland Park, MI
Bid Date: Jan 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.