Demolition, site work and new construction of a transportation facility in Columbus, Ohio. Completed plans call for the construction of a transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

The Scope of Work includes demolition of existing grass infields, asphalt shoulder and asphalt service roads and installation of concrete pavement, adjustment of existing storm structures, new fuel pit infrastructure and pavement markings for aircraft positions. The engineer's estimate for this project is $6,877,548. CRAA will reject any bids or unsolicited bid addenda that are received after the deadline. CRAA will reject late bids regardless of the cause for the delay. RAA reserves the right to reject any or all bids and to waive any informalities, irregularities, and technical defects of a minor nature. All bids are subject to all applicable Federal, State, and local laws, regulations, and rules. The Contract will be awarded to the lowest responsive and responsible bidder in accordance with Ohio law. CRAA, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. Bidders shall make a good faith effort to obtain Disadvantaged Business Enterprise (DBE) participation of 15% of the dollar value of the Contract in accordance with the FAA DBE Program, 49 CFR 26. For questions regarding the DBE Program, contact Business Diversity at BusinessDiversity@ColumbusAirports.com. Contractors seeking DBE certification should contact the Ohio Department of Transportation's (ODOT) Unified Certification Program at (614) 728-9598 or visit their website at www.ohioucp.org. SURETY REQUIREMENTS: The bidder must provide the required surety documentation at the time of the bid due date and time. The documentation shall comply with the requirements in 49 CFR Part 18.36(h)(1) and the Ohio Revised Code (ORC) Sections 153.57 and 153.571. These ORC Sections detail the requirements, however a list with percentages is provided below. Any Check or Letter of Credit instrument listed shall be drawn on a solvent bank authorized to do business in the State of Ohio, payable to the Columbus Regional Airport Authority. Acceptable surety documents in an amount equal to 10% of the Bid Price including Alternates: An irrevocable Letter of Credit, or Certified Check, or Cashier's Check Acceptable surety document in an amount equal to 100% of the Bid Price, including Alternates: A Bid and Performance Bond executed by the bidder and a surety company authorized to do business in the State of Ohio and satisfactory to CRAA, in substantial compliance with 49 CFR Part 18.36(h)(2) and ORC 153.571 and a Payment Bond in accordance with 49 CFR Part 18.36(h)(3). If the bidder is providing a certified check or cashier's check as security, please mail the check to: CRAA, L-3459, Columbus, OH 43260. Question Deadline 03/21/2025 at 12:00 PM ET

GC Bidding

Transportation Terminals

$6,877,548.00

Public - City

Demolition, New Construction, Site Work

71

21

3

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment, Office Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
65
Bidding Soon
1,117
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ramp 3 Reconstruction, Phase 4 Rickenbacker International Airport

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.