Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 27, 2025 at 8:00 PM
Updated October 1, 2024
Site work, paving and renovation of a civil project in Mesa, Arizona. Completed plans call for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.
The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Higley Lift Station project. SECTION I - PROJECT DESCRIPTION The City of Mesa (CITY) seeks hired a Construction Manager at Risk (CMAR) to construct a series of new sewer collection systems along Thomas Road, 56th Street, Longbow, and Higley Roads to expand its service collection area in the northeast portion of Mesa. Additionally, a new sewer lift station at the northeast corner of the North Higley Road and East Longbow Parkway intersection, south of the Loop 202 Freeway will be constructed to lift and force main flows near the intersection of Higley Road and McDowell Road. The main construction elements for the selected CMAR of this project consist of the following: o A new lift station with an initial capacity of 600 gallons per minute and sized for a planned buildout capacity of 1,000 gallons per minute. The site will include a back-up generator or secondary feed as required by the AAC along with provisions for odor control. The acquisition of land needed for the new lift station is currently underway. o Construction of approximately 2,900 linear feet of 8-inch sewer force main along North Higley o Construction of approximately 5,800 linear feet of 8-inch PVC gravity sewer main along Thomas and Higley Roads o Construction of approximately 5,400 linear feet of 8-inch PVC gravity sewer main along Thomas Road, 56th Street, and Longbow Road o Investigation of existing casings at 56th Street and Higley Road that cross the Loop 202. o Facilitate sequencing of the work to promote and accommodate the growth and development of surrounding private needs within this service area. o Abandonment of existing sewer gravity lines after an operational lift station is constructed. o Any other miscellaneous services and improvements to support the efforts and needs of these improvements, as needed. Additional responsibilities may include constructability reviews, investigative methods, bypass pumping, dewatering, effective odor control, sanitary sewer overflow prevention, traffic control, and public outreach. Although design is currently ongoing, the estimated construction costs range from $13,000,000 to $18,000,000 and the City anticipates construction completing for these efforts by Summer 2027. The City currently has professional services contracts with Consor, Entellus, and Wilson to design these improvements. The CMAR will work closely with and be an integral part of this project team during the completion of design and construction phases of the project. SECTION II - SCOPE OF WORK It is anticipated that the Construction Manager at Risk shall participate in Pre-Construction Services and Construction Services for this project. A. Pre-Construction Services by the CMAR may include, but not be limited to the following: o Lead project planning and scheduling for both the design and construction phases; o Provide for construction phasing and scheduling; o Provide alternative systems evaluation and constructability studies; o Advise the City of ways to gain efficiencies in project delivery and reduce overall delivery time; o Provide long-lead procurement studies and initiate procurement of long-lead items; o Participate in partnering sessions with the project team; o Participate in regular scheduled project coordination meetings; o Participate in constructability reviews at various levels of design; o Provide value engineering; o Provide detailed cost estimating and knowledge of marketplace conditions; o Develop and maintain the project cost model; o Provide subsurface investigations as requested (e.g. geotechnical, potholing, etc.) o Concur with plans and specifications prior to construction; and o Submit a Guaranteed Maximum Price (GMP) for City review and negotiation. B. Construction Services by the CMAR may include, but not be limited to the following: o Serve as the general contractor during construction; o Coordinate with various utilities; o Arrange for procurement of materials and equipment; o Schedule and manage site operations; o Provide quality control; o Bond and insure the construction; o Comply with all federal, state and local permitting requirements; o Maintain a safe work site for all project participants; and o Provide commissioning and closeout services, if applicable. All interested firms are encouraged to attend the Pre-Submittal Conference since City staff will not be available for meetings or to respond to individual inquiries regarding the project outside of this Pre-Submittal conference. In addition, meeting minutes or any other information will not be posted from the Pre-Submittal Conference. ADDENDUM NO. 1 - Change project number and name From: CP0617LS06 North Higley Lift Station To CP0617LS06 North Higley Lift Station and CP0619NS15 Thomas Road Sewer *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Water / Sewer
$18,000,000.00
Public - City
Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
December 1, 2025

Multiple Locations, Mesa, AZ
Related To This Project
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Mar 25 2025
Mesa, AZ
Bid Date: Mar 25 2025
Mesa, AZ
Bid Date: Apr 17 2025
Mesa, AZ
Bid Date: Mar 26 2025
Mesa, AZ
Bid Date: Apr 16 2025
Mesa, AZ
Bid Date: Mar 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFQ Construction Manager at Risk - North Higley Lift Station and Thomas Road Sewer
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.