BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a civil project in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Bids shall be sealed and shall have the name and address of the bidder and the contract for which the bid is being submitted on the outside of the envelope. All bidders shall bid in accordance with and upon the Bid Forms included in the contract documents. Bids are requested for the following work: 5,100 Cubic Yards Common Excavation 3,600Cubic Yards 11 1/2 " Base Aggregate Dense 1,750Tons of HMA Pavement 7.200 Lineal Feet of 24-inch Curb & Gutter 9,000 Square Feet of 6-inch Driveway Aprons 2,400 Lineal Feet of 8"- 24" Storm Sewer 1,040 Lineal Feet of Storm Sewer Laterals 470 Lineal Feet of 8"-12" Sanitary Sewer 1,600 2,900 Lineal Feet of Sanitary Sewer Laterals Lineal Feet 8" Water Main 1.000 Lineal Feet of Poly Water Service 5,500 Square Yards Turf Restoration Est. Value: $ 1,750,000.00 Est. Completion Date: Oct. 10, 2025 BID SECURITY - No bid shall be received unless accompanied by a certified check or satisfactory bid bond payable to the Village of Allouez in the amount not less than 5% of the maximum bid as guarantee that, if the bid is accepted, the bidder will execute and file the contract, performance/payment bonds and insurance certification, as required by the contract documents, within ten (10) days after the Notice of Award. BID REJECTION -The OWNER reserves the right to reject any and all bids, waive any information in bidding or to accept the bid or bids which best serves the interests of the Village of Allouez. WITHDRAWAL OF BIDS - No bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the OWNER. PROOF OF RESPONSIBILITY A proof of responsibility (pre-qualification) for all contracts must be filed with the Village of Allouez, Director of Public Works, 1900 Libal Street, Green Bay Wisconsin 54301 no later than three (3) working days prior to the date of the bid opening, and shall show sufficient ability, equipment and experience to properly perform the contract. The Village of Allouez decision as to qualifications shall be final. Park Drive – St. Francis Dr. to Arrowhead Dr. Crescent Drive – St. Francis Dr. to Arrowhead Dr. St. Francis Drive – Langlade Rd. to S. Webster Ave.

Award

Roads / Highways

$1,658,941.00

Public - City

Paving, Site Work

77

10

4

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
49
Bidding Soon
430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

May 26, 2025

Project location map

Multiple Locations, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.