BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 13, 2025

Renovation of a mixed-use development in Saline, Michigan. Conceptual plans call for the renovation of a educational facility.

Filter First Replacement Installation PURPOSE The purpose of the Request For Proposals ("RFP") is for Saline Area Schools (the "School District") to obtain proposals from qualified contractors to provide a comprehensive installation of the Saline Area Schools Filter First Replacement Installation (the "Work"). WORK SCOPE Include but not limited to: 1. The existing fixture to be removed and the new fixture to be installed with the necessary trim are identified with the link above. The link has a picture of the existing fixture and the name of the replacement fixture. 2. Remove and dispose of the existing fixture off-site. 3. Installation of the new fixture including but not limited to all necessary supply, sanitary, & vent piping from the existing fixture removal. 4. Caulking of all new fixtures and all clean up. 5. Receiving and offloading all fixtures. The supplier will deliver the fixtures to the receiving area for each building. The contractor is to place each fixture in the building at a location designated by the District for storage. 6. The District will provide a location in the building for staging. Deadline for written Requests For Clarifications 4 p.m. Local Time, March 6, 2025. All requests For clarification must be directed to Mark Paulus at lecoleplanners3@gmail.com. Substantial Completion of Work August 15, 2025 Final Completion of Work September 15, 2025 Bid Security: Contractors must submit with its Proposal bid security in the form of a Bid Bond issued by a qualified surety or certified check/money order in an amount of five percent (5%) of the Proposal ("Bid Security"). Performance Bond: Successful Contractors whose Proposals are $50,000 or more will be required to furnish Performance and Payment Bonds, in a form satisfactory to the School District, in the amount of 100% of its Proposal by a Treasury-listed Surety licensed to do business in the State of Michigan, and the attorney-in-fact who executed the Performance and Payment Bonds on behalf of the Contractor shall attach a certified, current copy of its power of attorney. The cost of the Bonds shall be included in each Proposal

Conceptual

Educational

$130,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
240
Bidding Soon
2,735
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

Project location map

Multiple Locations, Saline, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.