EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Washington, District of Columbia. Completed plans call for site work for a water / sewer project.

This project portfolio consists of the design and construction of improvements to two potable water pumping stations, two storage reservoirs, and improvements to theAnacostia 3rd High pressure zone and associated piping and valves. These projects will build and/or rehabilitate key infrastructure to ensure efficient and secure operations. The project portfolio aims to sustain adequate pressure and supply, address aging infrastructure concerns, improve operational efficiency, mitigate risks, and increase capacity to meet current and future demand. Estimated project values range from $10 million to $40 million for each of the five projects in this package. Specifically, the project portfolio includes: 1. Anacostia Pumping Station Upgrades 2. Fort Stanton Reservoir #2 Improvements 3. Fort Stanton Reservoir #1 Replacement 4. Bryant Street Pumping Station Improvements 5. Anacostia 3rd High Pressure Zone Improvements. In addition, this portfolio may include other related but unplanned projects, which may be added in the future

Post-Bid

Water / Sewer

$125,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
86
Bidding Soon
1,952
All Active Projects
822
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

July 25, 2025

img_map_placeholder

Multiple Locations, Washington, DC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Water Pumping and Storage Facilities Upgrade Progressive Design Build (PDB)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.