Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Site work and paving for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and transportation facility.
This project will remove approximately 12,000 square yards of failed asphalt pavement along the bus lane in the Economy Parking Lot and construct a new Portland Cement Concrete (PCC) heavy-duty pavement section. Work also includes concrete panel replacement and repair, asphalt milling and overlay, asphalt crack repair and seal, and pavement markings. A bid bond or cashier's check in a form acceptable to the City and in an amount equal to at least five percent (5%) of the total amount of the Bid will be required on each Bid. Bid bonds/checks will be returned to unsuccessful bidders after tabulation and award of the contract. Non-discrimination in Employment: Bidders on This Work Will Be Subject to the Applicable Provisions of All Federal Laws, Rules, Regulations, or Orders. Equal Employment Opportunity: the Proposed Contract is Under and Subject to Executive Order 11246 of 24 September 1965, as Amended, and to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specifications Including the Goals and Timetables for Minority and Female Participation. This Contract Will Be Awarded in Compliance With the City's Building Improvement or Public Works Projects Procurement Code Requirements Which Take Into Account Certain Factors in the Bidder's Work Environment. For More Information, Please See Salt Lake City Code Section 3.24.115. Question Deadline: 03/20/2025 at 5:00 PM MT PN - 542508 The Engineers Estimate is in the range of $2.9 million to $3.5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Sidewalks / Parking Lot
$3,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2025
April 28, 2025
W Terminal Dr, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: Mar 28 2025
Salt Lake City, UT
Bid Date: Mar 21 2025
Salt Lake City, UT
Bid Date: Mar 13 2025
Salt Lake City, UT
Bid Date: Apr 01 2025
Salt Lake City, UT
Bid Date: Apr 10 2025
Salt Lake City, UT
Bid Date: Mar 21 2025
Salt Lake City, UT
Bid Date: Mar 17 2025
Salt Lake City, UT
--
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Apr 03 2025
Salt Lake City, UT
Bid Date: Apr 03 2025
Salt Lake City, UT
Bid Date: Mar 13 2025
Salt Lake City, UT
Bid Date: Mar 18 2025
Salt Lake City, UT
--
Salt Lake City, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
