BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

This is a service / maintenance or supply contract in Mobile, Newfoundland. Contact the soliciting agency for additional information.

Closing Time: 3:00 PM (NT) Question Acceptance Deadline 2025/03/18 03:00:00 PM NDT a) The contractor shall supply all labour, materials, and equipment necessary for the removal and disposal of garbage from the buildings identified. b) The contractor shall visit each building prior to submitting his/her tender in order to determine the quantities of garbage to be removed and any other conditions affecting the work. c) Garbage shall be removed from each building with the number of collections per week being that as outlined. d) For contracts denoted "C" requiring containers: i. The contractor shall supply, place and maintain these containers. ii. The containers shall be vermin proof, fire resistant, and constructed of minimum 22-gauge steel construction and of the capacities as outlined in List of Buildings. Containers shall be equipped with suitable lids or covers for the purpose of weather protection and/or savaging by seagulls or other like birds. The contractor shall ensure that the containers are kept in good repair, periodically disinfected and removed from the building site for washing and steam cleaning as required. iv. Containers are to be fitted with the necessary attachments to provide for the mechanical lift method to the collection vehicle. V. Containers are to be designed for top or rear loading depending on the building requirements. vi. All steel containers supplied by the contractor shall have a locking mechanism complete with keys and lockset in order that such containers can be secured between pickup times to prevent unauthorized personnel from placing waste into the containers. The contractor shall supply suitable keys to each applicable Building Manager. Contractors shall ensure that their pickup service staff are equipped with keys for applicable containers and shall be responsible for unlocking the containers as required at each pickup time. Should at any time the contractor claim they were unable to complete a pickup due to not being able to unlock the container, then credit for such a pickup will be deducted from their contract payments. The contractor will be responsible for maintaining the locking mechanism and should it become damaged they will be responsible for replacement at no cost to the owner. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Sub-Bidding

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Multiple Locations, Mobile, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.