BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Renovation of an educational facility in Westfield, Massachusetts. Completed plans call for the renovation of a educational facility.

The project consists of but is not limited to the replacement of pool HVAC equipment, pool plumbing, lighting, windows, tile pool bowl rework. Sub Bid Categories: HVAC, Electrical, Tile, and Plumbing, Lathing, and Plastering. Ely Campus Center - 577 Western Avenue, Westfield, MA 01086 Contact Bryan Forrette (bforette@westfield.ma.edu) with inquiries concerning the pre-bid site visit. The work is estimated to cost $2,700,000.00. All proposals for this program are subject to the provisions of either or both Mass. G.L., Chapter 30, Section 39M as amended and Mass. G.L., Chapter 149, Section 44A-44T inclusive. Attention is directed to the minimum wage rate to be paid on the work as determined by the Commissioner of Labor and Industries under the provisions of Mass. G.L., Chapter 149, and Section 26 to 27 D inclusive. DCAMM certificate required. The Awarding Authority reserves the right to waive any informality in or to reject any and all bids if it is in the public interest to do so. The Minority Business Enterprise and Women Business Enterprise (MBE/WBE) participation goals for this are _4.2_% MBE and _8.8_% WBE; The applicable minority workforce utilization percentage is 15.3 %. The applicable women workforce utilization percentage is 6.9 %. A. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: The Project Scope consists of but is not limited to the replacement of pool HVAC equipment, pool plumbing, lighting, windows, tile, & pool bowl rework in accordance with the documents prepared by PRA, 700 Massachusetts Ave, 4th Floor, Cambridge, MA 02139. 3. The Contractor shall be responsible for providing and paying for a construction administration software application to be used by all participants on the Project at no cost. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or dest royed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. Completion- 189 consecutive calendar days. Bid Result Tile - Ayotte & King For Tile, Inc., - $97,800.00 Plumbing - Edward F Corcoran Plumbing & Heating - $40,300 Heating / Ventilating / AirConditioning (HVAC)-1,252,716 Electrical Work - Icon West Corporation - 270,700

Bid Results

Educational

$1,661,516.00

Public - State/Provincial

Renovation

66

24

48

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
589
Active Projects
270
Bidding Soon
4,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 19, 2025

Project location map

577 Western Ave, Westfield, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.