Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The 2025 PCC Reconstruction Program - NW 9th Street project includes pavement reconstruction and utility improvements along NW 9th Street from approximately 375 feet west of NW School Street to just east of NW Logan Street in the City of Ankeny. The 2025 PCC Reconstruction Program - NW 9th Street project includes pavement reconstruction and utility improvements along NW 9th Street from approximately 375 feet west of NW School Street to just east of NW Logan Street in the City of Ankeny. The construction improvements include the slip-form paving of approximately 3,400 SY of 8" thick PCC Class C-SUD street pavement, approximately 950 SY of 7" thick PCC Class C-SUD intersection handwork, 275 SY of 6" thick PCC Class C residential driveways, 250 LF of 54" storm sewer, 250 LF of 48" storm sewer, 400 LF of 24" storm sewer, and 150 LF of 12" storm sewer. Other associated improvements include Class 10 excavation, subgrade preparation, modified subbase placement, subdrain installation, removal and replacement of storm sewer structures, removal and replacement of water valves, ADA compliant sidewalk ramps, temporary surface restoration, compost amendment of existing topsoil, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. Doc Note - Paper copies of the Contract Documents are available from the City of Ankeny Public Services Building, 1210 NW Prairie Ridge Drive, Ankeny, Iowa, 50023. The initial set is free of charge to prospective bidders, i.e. qualified general contractors. A fee of Fifty Dollars ($50.00) per set will apply to additional sets and to bidding documents requested by other than prospective bidders. This fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a good usable condition. (2) They are returned within fourteen (14) calendar days after the award of the project. An individual must call 515-963-3520 in advance to reserve a paper copy. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Ankeny, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Ankeny. The bid shall contain no condition except as provided in the specifications. Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Ankeny and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Ankeny from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the Contract. The Contractor shall substantially complete Stage 1 of the overall project within forty (40) working days. Substantial completion for Stage 1 of the overall project shall be defined as all utility, grading, and pavement construction completed; the new pavement markings and signs installed; and the new streets, driveways, and sidewalks fully open to traffic and temporary surface restoration completed. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete Stage 1 in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). An enhancement of payment in the amount of Twenty-Five Thousand Dollars ($25,000.00) will be issued to the Contractor if substantial completion for Stage 1 of the overall project is achieved within forty (40) working days AND the work is completed on or before Friday, August 15, 2025. The Contractor shall substantially complete the overall project, both Stages 1 and 2, within eighty-five (85) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed; the new pavement markings and signs installed; compost amendment completed; and the new streets, driveways, and sidewalks fully open to traffic. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the overall project in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days after the punch list has been provided to the Contractor following substantial completion of Stage 1 AND Stage 2 of the project. Full completion for the overall project shall be defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Ankeny does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Award

Roads / Highways

$1,366,666.00

Public - City

Paving, Site Work

68

6

7

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
103
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 9, 2025

Project location map

NW 9th St, Ankeny, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.