EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 15, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Quarryville, Pennsylvania. Completed plans call for the renovation of a educational facility.

Each bid must be accompanied by bid security in the form of a certified check, cashier's check, or bid bond of a surety company legally authorized to do business in the Commonwealth of Pennsylvania, in an amount equal to ten (10%) of the bid. No bidder may withdraw his bid for a period of sixty (60) days after the date of the actual opening of bids. The successful bidder will be required to furnish and pay for satisfactory performance and payment bond or bonds in an amount equal to one hundred percent (100%) of the contract price within ten (10) days after the Contract has been awarded and may also be required to furnish a Contractor's Qualification Statement. Solanco School District reserves the right to reject any or all bids, and to accept or reject any parts thereof, or items therein, and to waive any defects or irregularities in bids and bid securities, and to make the award that is determined to be in the best interest of the District. The project is subject to the provisions of the Pennsylvania Human Relations Act, P.L. 744 and the Pennsylvania Prevailing Wage Acts. Bidders shall refer to the provisions of Federal and State Statutes, Rules and Regulations dealing with the prevention of environmental pollution and the preservation of public, natural resources that affect the project, said provisions being submitted as part of the Specifications pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania approved October 26, 1972.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

5

9

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Wall Finishes, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC)
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Erosion and Sedimentation Controls
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
163
Bidding Soon
2,692
All Active Projects
1,159
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 17, 2025

img_map_placeholder

1866 Robert Fulton Hwy, Quarryville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Electrical Upgrades at Swift Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.