Published April 2, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Pflugerville, Texas. Completed plans call for the renovation of a educational facility.

The Pflugerville Independent School District will accept responses to its Competitive Sealed Proposal (CSP) fromfirms interested in providing: Restroom Modernization for Highland Park ES, Park Crest MS & Connally High School. SCOPE OF WORK 1. The Pflugerville Independent School District ("PfISD" or "District") is soliciting requests for proposals (RFP's) for services related to Restroom Modernizations for Highland Park ES, Park Crest MS and Connally High School. The awarded firm will be expected to provide services in accordance with specifications and conditions embodied within this document. 2. The project has an estimated budget of $5,900,000. 3. The scope of work includes the renovation of Highland Park ES, Park Crest MS and Connally High School. The project is more adequately described within the project manual. 4. PfISD believes the information included in this CSP is materially accurate, however, the PfISD does not warrant this information to be free from errors or omissions. Proposers are encouraged to inspect the premises prior to submitting a response. 5. The district is working with the following architectural/engineering firm to complete this project: DLR Group of Texas 816 Congress Ave Ste 1600 Austin, TX 78701 6. Upon approval of the rankings by the Board of Trustees, the District's representative Owner will attempt to negotiate a contract with the selected Proposer. If the prices proposed are more than the District's budget for the Project, the Owner's representative may discuss with the selected Proposer options for scope or time modifications and any price change associated with the modification. If the representative is unable to reach a contract with the selected Proposer, the representative may formally end negotiations with that Proposer and proceed to the next ranked Proposer in the order of the selection ranking until a contract is reached or all proposals are rejected. 7. The district intends to obtain substantial completion of this project by July 31, 2025 and final completion of this project by August 8, 2025. 8. The warranty, general, special terms and conditions, insurance, submittal documents and specifications as stated herein shall apply and shall not be nullified, voided or altered in any way by the inclusion of the Proposer's pre-printed forms with this proposal or any other document submitted during delivery of product, invoicing, acknowledgement letters, emails, faxes, routine communications between the contracted parties, of subcontract employees, or third partiesunless specifically acknowledged and agreed in writing by PISD. 9. Upon receipt of bids, the District will review the bids and may request additional information, including product or service presentations, as appropriate.\ The project has an estimated budget of $5,900,000.

Post-Bid

Educational

$5,900,000.00

Public - City

Renovation

105

76

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Acoustical Tile Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Specialty Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Furniture, Seating, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Trenching, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
44
Bidding Soon
2,262
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Pflugerville, TX

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Restroom Modernizations for Highland Park ES, Park Crest Ms and Connally High School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.