Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 11, 2025
Renovation of a military facility in Columbus, Mississippi. Completed plans call for the renovation of a military facility.
Amendment 02: RFI answers are posted in the SAM.gov 1. Compatibility of Existing Low-Pressure Ductwork with New VAV System: The SOW specifies a new VAV system tied into existing ductwork at the mechanical room wall. However, the existing system is low-pressure, while standard VAV designs typically require medium-pressure ductwork. Although RFI #13 confirms the ductwork is to remain, this does not address how the performance discrepancy will be mitigated. Could you please confirm whether the Government intends to retain the low-pressure distribution system and, if so, whether the VAV system should be adapted to operate within those limitations The Government intends to retain the existing low pressure ductwork. The air handling system needs to be adapted to handle this situation. 2. Heating Water Supply to VAV Terminal Units: The VAV boxes are noted to include reheat coils, yet the scope does not mention extending the heating water loop to serve them. Without local reheating capability, space temperature control would be limited, as supply temperature modulation at the AHU cannot independently serve multiple zones. We respectfully ask whether hot water piping should be extended to each new VAV terminal unit or if another reheat method is expected. Extend heating water loop to serve all VAV boxes. 3. Clarification on the "Main Activity Room" Inclusion: The 2020 record drawings identify a "Main Activity Room" not referenced in the solicitation drawings or AHU coverage notes. While RFI #19 states that the HVAC footprint has not changed, this does not confirm whether this space is to be conditioned under the current project. Could you please confirm whether the Main Activity Room is included in the scope of work for the new HVAC system The main activity room is part of the youth center annex and is served by a separate HVAC system that is not covered in this project.. The Contractor must provide all plant, labor, equipment, transportation, and tools required to replace, modify, and upgrade mechanical equipment of B348. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. The work required in this project includes, but is not limited to, replacement of the chiller, air handler, piping, insulation, pumps, and related electrical components. A full recommissioning and testing, adjusting, and balancing of the HVAC system will also be required under this contract. , RSVP, and Base Entry: The Government invites you to a on Monday, 12 May 2025 at 2:30 PM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 2:00 PM CST on 07 May 2025. To register, please the POC requesting the DoD Safe drop-off link to securely upload the Entry Authorization Listing (EAL) document. If you do not contact the POC by 2:00 PM CST on 07 May 2025, you will not be able to attend the . Identification: All attendees must bring a valid photo ID. Vehicle Requirements: If driving, please ensure the driver has driver's license, vehicle registration, and proof of insurance. Additional Info: All RFIs must be submitted NLT 3:00 PM CST, on 15 May 2025. IAW FAR 36.204(e) - The range of magnitude for this procurement is between 500,000 and 1,000,000. NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for s" to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$1,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
February 10, 2026
To Be Determined, Columbus, MS
Related To This Project
Columbus, MS
Bid Date: Mar 25 2025
Columbus, MS
Bid Date: Mar 25 2025
Columbus, MS
Bid Date: Mar 25 2025
Columbus, MS
Bid Date: Mar 25 2025
Columbus, MS
Bid Date: Aug 18 2025
Columbus, MS
Bid Date: May 23 2025
Columbus, MS
Bid Date: Jun 11 2025
Columbus, MS
Bid Date: Jun 17 2025
Columbus, MS
Bid Date: Apr 10 2025
Columbus, MS
Bid Date: May 22 2025
Columbus, MS
Bid Date: Mar 11 2025
Columbus, MS
Bid Date: Jul 02 2025
Columbus, MS
Bid Date: Feb 24 2025
Columbus, MS
Bid Date: Feb 21 2025
Columbus, MS
Bid Date: Feb 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
