BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work, paving and outdoor lighting for a mixed-use development in Lancaster, California. Completed plans call for outdoor lighting for a playground / park / athletic field; for site work for a sidewalk / parking lot; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and playground / park / athletic field.

Eastside Union School District is seeking qualified contractors to submit bids for the installation of (7) shade structures at (3) of our elementary schools. The scope work includes but is not limited to installation of durable and safe shade structures in designated areas on school grounds. We are also seeking installation of water filling stations at designated school sites. o Enterprise Elementary School Shade Structure and Playgrounds o Scope of work includes, but is not limited to a) the demolition of (2) existing drinking fountains, the demolition of (3) 38'x16' existing shade structures, and the demolition of (1) 30'x40' existing shade structure; b) the installation of (2) 40'x44' new metal shade structures and associated flatwork; c) the installation of (1) 40'x64' new metal shade structure and associated flatwork; d) the installation of (4) new accessible bottle filling stations with associated framing; e) the installation of (2) new 24'x50' artificial turf areas; and f) the installation of new parking signages at exiting ADA stalls in existing parking lots. Work includes new underground utilities with sawcut, trenching, backfill with asphalt and concrete patch back, as well as new electrical conduit pathway and wiring through existing buildings (walls, ceilings, patching, painting, etc.) to existing panels for new power, lighting, and associated controls. Refer to the Bidding Documents for more information. o Columbia Elementary School Shade Structure and Playgrounds o Scope of work includes, but is not limited to a) the demolition of (2) existing drinking fountains; b) the installation of (1) 40'x64' new metal shade structures and associated flatwork; c) the installation of (4) new accessible bottle filling stations with associated framing; d) the installation of new artificial turf; and e) the installation of new parking signages at existing ADA stalls in existing parking lot. Associated work includes new underground utilities with saw cut, trenching, backfill with asphalt and concrete patch back, as well as new electrical conduit pathway and wiring through existing buildings (walls, ceilings, patching, painting, etc.) to existing panels for new power, lighting, and associated controls. Refer to the Bidding Documents for more information. o Eastside Elementary School Shade Structure and Playgrounds o Scope of work includes, but is not limited to a) the demolition of (6) existing drinking fountains; b) the installation of (1) 40'x44' new metal shade structures and associated flatwork; c) the installation of (1) 30'x36' new metal shade structure and associated flatwork; d) the installation of (1) 40'x64' new metal shade structure and associated flatwork; e) the installation of (4) new accessible bottle filling stations with associated framing; f) the installation of (1) new 40'x44' rubberized surface area; and g) the installation of new parking signages at exiting ADA stalls in the existing parking lot. Work includes new underground utilities with sawcut, trenching, backfill with asphalt and concrete patch back, as well as new electrical conduit pathway and wiring through existing buildings (walls, ceilings, patching, painting, etc.) to existing panels for new power, lighting, and associated controls. Refer to the Bidding Documents for more information. To bid on this Project, the Bidder is required to possess the following State of California Contractor License: B, C10, C36 and other applicable licenses. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Eastside Union School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. All work needs to be completed by September 9, 2025 The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) calendar days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,549,789.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
157
Bidding Soon
3,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

June 12, 2025

Project location map

Multiple Locations, Lancaster, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.