Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Renovation of a water / sewer project in Oak Creek, Wisconsin. Completed plans call for the renovation of a water / sewer project.
The project contemplated consists of replacement of two centrifugal basin drain pumps (basin drain pump 1 and basin drain pump 2) and associated equipment. The equipment is located within the Sludge Thickener Building (Building 358) of the South Shore Water Reclamation Facility Project Owner Number: S06049C03 Remove and dispose of basin drain pump 1 and basin drain pump 2. Remove and dispose of the pump motors and baseplates. Remove and dispose of the 6-inch plug valve on the suction side of the pumps, 4-inch plug valve on the discharge side of the pumps and 4-inch check valve on the discharge side of the pumps. Remove the basin drain pump reinforced concrete equipment pads. Furnish and install new 6-inch plug valves on the suction side of each pump, new 4-inch plug valve on the discharge side of each pump, and new 4-inch check valves on the discharge side of each pump. Form and place new reinforced concrete equipment pads in the location of basin drain pumps 1 and 2. Furnish and install two new pump baseplates. Epoxy coat the new baseplates prior to installing the new pump equipment. Furnish and install two new basin drain pumps, flexible couplings, and electrical motors on the new baseplates. Furnish and install new stainless steel seal water and pump volute vent drain lines. Connect, align, and balance the new motors and pumps. Connect pump motors to existing power feed including installation of new on/off switches and flexible non-metallic electrical conduits. Complete a Functional Acceptance Test (FAT) for each of the new pumps and valves. Complete all other work described in the Specifications and as necessary to complete the project. MBE (13%), WBE (2%), DVBE (5%), SBE (5%) Question Deadline 07/21/2025 All questions related to this proposed Contract, pre-bid presentation, site tour , or interested bidders list must be directed in writing to Millie Neidhardt with the District's procurement office at eneidhardt@mmsd.com, no later than 3 days before the bid opening date.
Bid Results
Water / Sewer
$262,744.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
To Be Determined, Oak Creek, WI
Related To This Project
Oak Creek, WI
Bid Date: Apr 18 2025
Oak Creek, WI
Bid Date: Mar 26 2025
Oak Creek, WI
Bid Date: Apr 17 2025
Oak Creek, WI
--
Oak Creek, WI
Bid Date: May 02 2025
Oak Creek, WI
Bid Date: May 02 2025
Oak Creek, WI
Bid Date: May 02 2025
Oak Creek, WI
--
Oak Creek, WI
Bid Date: Mar 18 2025
Oak Creek, WI
Bid Date: Mar 18 2025
Oak Creek, WI
Bid Date: Feb 13 2025
Oak Creek, WI
Bid Date: Feb 21 2025
Oak Creek, WI
--
Oak Creek, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.