Renovation of a water / sewer project in Oak Creek, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The project contemplated consists of replacement of two centrifugal basin drain pumps (basin drain pump 1 and basin drain pump 2) and associated equipment. The equipment is located within the Sludge Thickener Building (Building 358) of the South Shore Water Reclamation Facility Project Owner Number: S06049C03 Remove and dispose of basin drain pump 1 and basin drain pump 2. Remove and dispose of the pump motors and baseplates. Remove and dispose of the 6-inch plug valve on the suction side of the pumps, 4-inch plug valve on the discharge side of the pumps and 4-inch check valve on the discharge side of the pumps. Remove the basin drain pump reinforced concrete equipment pads. Furnish and install new 6-inch plug valves on the suction side of each pump, new 4-inch plug valve on the discharge side of each pump, and new 4-inch check valves on the discharge side of each pump. Form and place new reinforced concrete equipment pads in the location of basin drain pumps 1 and 2. Furnish and install two new pump baseplates. Epoxy coat the new baseplates prior to installing the new pump equipment. Furnish and install two new basin drain pumps, flexible couplings, and electrical motors on the new baseplates. Furnish and install new stainless steel seal water and pump volute vent drain lines. Connect, align, and balance the new motors and pumps. Connect pump motors to existing power feed including installation of new on/off switches and flexible non-metallic electrical conduits. Complete a Functional Acceptance Test (FAT) for each of the new pumps and valves. Complete all other work described in the Specifications and as necessary to complete the project. MBE (13%), WBE (2%), DVBE (5%), SBE (5%) Question Deadline 07/21/2025 All questions related to this proposed Contract, pre-bid presentation, site tour , or interested bidders list must be directed in writing to Millie Neidhardt with the District's procurement office at eneidhardt@mmsd.com, no later than 3 days before the bid opening date.

Bid Results

Water / Sewer

$262,744.00

Public - County

Renovation

4

17

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
7
Bidding Soon
2,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

To Be Determined, Oak Creek, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.