Published May 9, 2025 at 8:00 PM

Updated July 16, 2025

Remodeling of an educational facility in Columbus, Nebraska. Completed plans call for the remodel of a educational facility.

The General, Mechanical and Electrical, will be under one Bid. All subcontractor quotations shall be sent to the General Contractor. Bid Security is required to be submitted with bid proposal form. Make payable to Central Community College in the amount of 5% of the Lump Sum Bid Amount. Bid Security shall be of cashiers check, certified check, or Bid Bond issued by a Surety licensed to conduct business in the State of Nebraska. Form of Bid Bond is AIA Document A310. Any agent signing a bid bond on behalf of the Surety must attach a Power of Attorney effectively evidencing the agent's authority to bind the Surety to the performance of the Bid Bond. Performance Bond: The Contractor shall be required to furnish acceptable bonds to complete the work and pay for all labor and materials used, said bonds to be in the amount of 100% of total amount of the Contract. Bid Document Information can be obtained online. The deposit will be returned in full only if a qualified bid is submitted and the Bid Documents are returned within fifteen (15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Bid Documents are returned with seven (7) days prior to the bid opening. ALL BID DOCUMENTS SHALL BE RETURNED to the office of Wilkins Architecture Design Planning, L.L.C., 2204 University Drive, Suite 130, Kearney, Nebraska, 68845. Question Deadline 03/28/2025 Clarifications requested by bidders must be in writing not less than four (4) days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients. Verbal answers are not binding on any party. No technical questions will be answered by the Architect's /Engineer's office(s) during the twenty-four (24) hours immediately preceding the bid opening time and date. Owner reserves the right to accept or reject any or all offers and to pass upon the regularity or waive any irregularities of any bid. The Owner intends, but shall not be required, to interview the two (2) lowest responsible bidders to determine the lowest responsible bidder. Any award of contract shall be made to the lowest responsible bidder, taking into consideration the best interests of the Owner, the quality performance of the Contractor, and his ability to perform the work. The decision to award the contract shall be in the sole discretion of the Owner. After acceptance by Owner, Architect on behalf of Owner, will issue to the successful bidder, a written Notice To Proceed. TBD: Contractors interviews in Central Community College - Grand Island, Administration Office Board Room 80. April 17, 2025: Low bid contractor recommendation presented to Board of Governors. April 21, 2025: Contract awarded. Start Digital Document Submittal Service (ORACLE, Submittal Exchange) and Administrative Requirements. May 12, 2025: Construction Starts. August 1, 2025: Substantial Completion. August 15, 2025: Final Completion

Award

Educational

$489,100.00

Public - State/Provincial

Remodeling

31

19

24

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
89
Bidding Soon
828
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 12, 2025

Project location map

4500 63rd St, Columbus, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.