Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2025 at 8:00 PM
Updated October 1, 2024
Demolition, site work, renovation and addition to a mixed-use development in Albany, New York. Completed plans call for the renovation of a clubhouse / community center; for the addition of a fitness / recreation center; for the demolition of a clubhouse / community center; for site work for a fitness / recreation center; parking garage; and water / sewer project.
Reference Number 0000379289 The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Albany South Community Center Project consists of partial demolition of the existing community center along with a new activity and gymnasium addition and the renovation and repurposing of the existing building. The site will be developed to provide for displaced and additional parking, security as well as improved stormwater treatment system and necessary utility services. Each prime contract covers work within the contract category for the proposed addition renovation and site work. Question Deadline 03/28/2025 at 4:00 PM ET Questions are submitted online No . Questions pertaining to the bid package should be directed Martin Daley, at (518) 407-0651 or email at mdaley@albanyny.gov. Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions To Bidders. If a bid deposit is not submitted with the bid, the bid may be deemed incomplete and may not be considered. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price. It is anticipated the project will commence by June 1, 2025 and reach substantial completion on or before December 19, 2025 *Owner reserves the right to reject any and all Bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive or Conditional Bids.
Sub-Bidding
Clubhouse / Community Centers
$200,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
June 1, 2025

7 Hoffman Ave, Albany, NY
Related To This Project
Albany, NY
Bid Date: Mar 26 2025
Albany, NY
Bid Date: Mar 26 2025
Albany, NY
Bid Date: Mar 13 2025
Albany, NY
Bid Date: May 03 2021
Albany, NY
Bid Date: Apr 08 2025
Albany, NY
Bid Date: Apr 22 2025
Albany, NY
Bid Date: Apr 16 2025
Albany, NY
Bid Date: Apr 08 2025
Albany, NY
Bid Date: Apr 08 2025
Albany, NY
Bid Date: Jun 06 2025
Albany, NY
--
Albany, NY
Bid Date: Apr 29 2025
Albany, NY
Bid Date: Mar 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Albany South Community Center (AKA Hoffman Rec Center) - Plumbing Improvements
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.