BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work and paving for a civil project in Guilford Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Guilford Township (The Owner) will receive bids for the Project entitled Archer Drive Extension Phase II located at Archer Drive, Guilford Township, Pennsylvania Clearing and grubbing, erosion and sedimentation controls, grading, storm sewer, stormwater basins, placement / compaction of fill material, paving Each bid shall be accompanied by a bid security in the form of AIA Document A310 Bid Bond, from an approved Surety Company, certified check, or cashier's check payable to the Owner, in an amount of not less than ten percent (10%) of the amount of the Base Bid. If the Bid Security is provided by check, a scan of check shall be submitted with bid, with the original being provided within two (2) business days of bid opening if bidder is the apparent low responsible bidder. Payment and Performance Bonds shall be required as specified in Section 00 5200a (AIA A101 Exhibit A - Insurance Exhibit) of the Project Manual. The Work shall commence no later than ten (10) days after the Owner issues the Notice to Proceed. The Owner reserves the right to waive any informalities in bids, or to reject any or all bids to the extent permitted by law. Question Deadline 03/18/2025 at 4:00 PM ET Online Portal QA The latest rough order of magnitude construction estimate was completed in November 2023 and estimated the contract value at $2,139,900.00. NPDES drawings will not be included with the Construction Drawings but will be provided to the awarded contractor. All proposed improvements and erosion and sedimentation control information required for the construction of this Project will be included in the Construction Drawings. An as-built survey, conducted by a PLS-certified surveyor, will be required. The Pricing Section/Bid Form will be updated to include this item, which will be compensated as a lump sum. We will revise the Bid Pricing Section / Bid Form to specify that flexible pavement and 2a subbase are paid by the square yard. This revision will be captured in the next Addendum. Bidders should enter one of the following responses: Individual, Partnership, or Corporation. We will revise to specify Publication 408, Section 413 for the wearing course. All testing required by the Project Manual will be the responsibility of the Contractor. An as-built survey, conducted by a PLS-certified surveyor, will be required. The Pricing Section/Bid Form will be updated to include this item, which will be compensated as a lump sum. Properly compacted ML/CL clay is acceptable as Basin Embankment Key Trench. The Township is okay with the closure of portions of Lighthouse Road and Overcash Road to facilitate the construction of this Project. Setting up the detour routes and maintaining signage will be the responsibility of the Contractor. Item 0205-0001 BORROW EXCAVATION is additional fill that will need to be imported to construct fill areas outside of the 2RC stone required under the roadway. Item 0206-0001 PLACEMENT AND COMPACITON OF EMBANKMENT AND FILL is for the placement of fill, including imported fill and on-site cut. This number excludes pavement/subbase/2RC subgrade in roadway material and topsoil respread. Provide 2RC at the width specified in the ARCHER DRIVE TYPICAL SECTION and the LIGHTHOUSE ROAD TYPICAL SECTION on sheet CD-24. A 1:1 side slope may be used for 2RC, with regular embankment fill and topsoil placed above up to finished grade. No separate inspector trailer is required. It is not anticipated that DB (DSP4) requirements will need to be submitted through ECMS as part of the Multimodal Grant. Bidders should evaluate the site to formulate a lump sum price for rock excavation. Agreed - it seems that 75 is missing. The Pricing Section / Bid Form will be revised to quantify 253 LF of 18 HDPE. Overcash Road, northwest of its intersection with the Archer Drive Extension, is planned for vacation by the Township and will become a private drive. Six inches of 2A modified stone is proposed for the portion of Overcash Road that will transition to a private drive A bid item will be added for General Conditions. Super silt fence may not be used to substitute wooden baffles in basins. Three (3) 24 socks are required to make up the diversion berm. Topsoil must be spread for the construction of the three temporary embankment sediment traps to facilitate seeding and stabilization. Additionally, upon removal of the sediment traps, topsoil must be reapplied to restore and stabilize the disturbed areas. A certified detour traffic plan is not required. Contractors must only coordinate road closures with the Township Road Master. Basin underdrain cleanouts are required. A detail will be added to the construction drawings. A concrete washout will be required. A concrete washout will be added to the Erosion and Sedimentation Control Plan sheets in the Construction Drawings, and a line item will be added to the Bid Form / Pricing Section. Class 4A non-woven geotextile is not required under the 2A portion of the paving section. The trench details on the Construction Drawings should be followed. These trench details have been approved by the Township. It is not assumed that material will be available onsite. A bid item will be added for importing clay. To the best of our knowledge, the onsite topsoil should be suitable for respreading without amendments, except for infiltration basin bottoms, where an amended soil mixture is proposed. A line item will be added for orange construction fence. Yes. CAD files will be made available as soon as possible. Ideally, we will incorporate any addendum revisions prior to releasing CAD. Questions Due Date: Apr 1st 2025, 2:00 PM EDT

GC Bidding

Roads / Highways

$2,139,900.00

Public - City

Paving, Site Work

29

29

31

3

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
199
Bidding Soon
2,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

June 10, 2025

Project location map

Archer Dr, Guilford Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.