BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work and new construction of a mixed-use development in Key West Nas, Florida. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; warehouse / distribution facility; and warehouse / distribution facility.

Construct restroom building consisting of three (3) restrooms and a Janitor Room. Question Deadline 04/14/2025 at 5:00 PM ET Online Portal A. Construct restroom building consisting of three (3) restrooms and a Janitor Room. The building will be one story, slab on grade, with 2" x 6" wood framed walls and a metal shingle roof. Roof to consist of metal shingles over peel and stick waterproofing over 3/4 " plywood over 3x wood framing. Wood framing shall mimic the design of the adjacent shed building. The schematic design (floor plan, roof plan, exterior elevations, building section, schedules) shall be as shown in attached drawings. Foundation shall be concrete slab-on-grade over auger piles. Foundation design shall be approved by the City of Key West Building Department. Interior finishes shall be per finish schedule. Each of the restrooms shall be cooled by ductless mini-split unit. The Janitor closet shall not have cooling. The Contractor shall provide and install one GFI 20A electrical receptacle in each interior room. The Contractor shall provide and install all electrical power as required for ductless mini-split units and condensing units. The Contractor shall provide and install one outdoor-rated exterior electrical receptacle at north wall. All restrooms shall be fully ADA compliant. The Contractor shall provide and install one exterior rated drinking fountain, with bottle filler, where shown. Provide and install vapor tight LED light fixtures and switching at each room. Provide and install exhaust fans at each restroom, including ducting to exterior. The Contractor shall provide and install floor drains at each restroom. Provide and install a tankless electric water heater for the janitor closet. Provide and install reinforced concrete walkway and landings to connect building to existing concrete paths, as shown on plan. The Contractor shall connect the new building to City of Key West water, sewage, power and other utility systems. The Contractor shall provide and install underground domestic water pipes from nearest point of existing water service and including a shut-off valve at entry to restroom building. The Contractor shall provide underground gravity piping for sewage from restroom building to closest point of exiting sewage service. The Contractor shall provide new electrical service from existing breaker panel located at the Lighthouse Gift Shop, underground to a new disconnect switch on outside wall of the restroom building. The Contractor shall provide and install galvanized half round gutters and round downspouts at front facade. B. Construction of the Storage building consisting of a Merchandise Storage room and Lawn Equipment Storage room. The building will be one story, slab on grade, with 2" x 6" wood framed walls and a metal shingle roof. The roof shall consist of metal shingles over peel-and-stick waterproofing over 3/4 " plywood over 3x wood framing. The wood framing shall mimic the design of the adjacent shed building. The schematic design (floor plan, roof plan, exterior elevations, building section, schedules) shall be as shown in the attached drawings. The foundation shall be concrete slab-on-grade over auger piles. The interior finish shall be in accordance with the finish schedule. The Merchandise Storage room shall be cooled by a ductless mini-split unit. The lawn equipment storage room shall not have cooling. The Contractor shall provide and install three GFI 20A electrical receptacles at the Merchandise Storage Room. The Contractor shall provide and install three GFI 20A electrical receptacles at the Lawn Equipment Storage Room. The Contractor shall provide and install all electrical power as required for ductless mini split units and condensing units. The Contractor shall provide and install one outdoor-rated exterior electrical receptacle at north wall. The Contractor shall provide and install vapor tight LED light fixtures and switching at each room. The Contractor shall provide and install reinforced concrete walkway and landings to connect building to existing concrete paths, as shown on plan. The Contractor shall provide and install galvanized half round gutters and round downspouts at front facade

Award

Playgrounds / Parks / Athletic Fields

$588,825.00

Public - County

New Construction, Site Work

8

7

6

11

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
74
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

June 23, 2025

Project location map

938 Whitehead St, Key West Nas, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.