BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 3, 2025

Renovation of a military facility in Eielson AFB, Alaska. Completed plans call for the renovation of a military facility.

Eie488 - Replace Generators at Chpp, Eielson Air Force Base, Alaska Db Phase 1 Rfpnaics: 236220 Size Standard $45m 8(a) Competitive Best Value Trade Off Source Selection8(a) Set Aside Sba Requirement # - Lk1742938112q Design and Replace the Existing Four 1,500 Kw Standby Generators and Associated Electrical Equipment That Provide Primary Power to the Eielson Air Force Base (Eafb) Power Plant Building B6203. The Two Bulk Fuel Storage Tanks Are to Remain but Are Required to Be Inspected and a Status Report Provided, Detailing Any Concerns, Issues and Deficiencies. The Bulk Fuel Tank Fuel Gauge Equipment is Not Functioning and Must Be Replaced. The Signage for the Generators and Bulk Fuel Storage Tanks Must Be Replaced. Design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.

Post-Bid

Military

$20,000,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
41
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

June 2, 2025

Project location map

To Be Determined, Eielson AFB, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.