Site work for a mixed-use development in South Porcupine, Ontario. Design plans call for site work for a road / highway; and industrial development.
The Crawford Nickel Sulphide project is located 42 km north of Timmins in the Timmins-Cochrane Mining Camp of northeastern Ontario. It lies in the western part of the mineral-rich Abitibi Greenstone Belt, which runs along the Ontario-Quebec provincial boundary and is the world's largest and best-preserved greenstone belt. The Crawford project is accessible from Provincial Highway 655. The Crawford open-pit mine/mill operation plan includes the mining of 2,794Mt of ore over its mine life, including two years of pre-stripping prior to the commissioning of the process plant. The Crawford mine plan comprises 3 separate open pits, including the main zone (MZ), east zone-west (EZ-W), and east zone-east (EZ-E). The MZ is the largest and will be the first to be mined. Mining at EZ-W will start during the final year of MZ operation, while that at EZ-E will begin 2 years after commencing mining at EZ-W. The project is expected to be among the top 5 largest nickel sulphide operations in the world, supplying nickel to manufacturers of stainless steel and electric vehicle batteries. Estimated mine life of the project is 40+ years. TIMELINE: Project planning and designs are ongoing. Technical report and preliminary economic assessment for the project were prepared by Ausenco Engineering Canada. Independent mining consultant David Penswick was hired to develop an open-pit mine design, mine production schedule, and financial model of the project; design firm is unreleased for publication. Engineering and consulting firm Golder and Wood Canada were appointed to collect the environmental data needed for the environmental social impact assessment (ESIA). A favorable economic impact study has been completed by Mansfield Consulting; results were publicly released October 15, 2025. A construction start timeline has yet to be confirmed. Project is expected to be completed by 2029. Preliminary costs: 2 phases of construction with initial phase costing 1.9 billion and the second phase costing 1.6 billion.
Design
Industrial
$3,500,000,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2026
ON-655, South Porcupine, ON
Related To This Project
South Porcupine, ON
Bid Date: Jul 31 2025
South Porcupine, ON
--
South Porcupine, ON
Bid Date: Jun 03 2020
South Porcupine, ON
Bid Date: Sep 10 2025
South Porcupine, ON
Bid Date: Sep 05 2025
South Porcupine, ON
Bid Date: Jun 26 2019
South Porcupine, ON
--
South Porcupine, ON
Bid Date: Nov 27 2025
South Porcupine, ON
Bid Date: Jun 17 2025
South Porcupine, ON
--
South Porcupine, ON
Bid Date: May 27 2025
South Porcupine, ON
Bid Date: May 15 2025
South Porcupine, ON
Bid Date: May 08 2025
South Porcupine, ON
Bid Date: Apr 17 2025
South Porcupine, ON
Bid Date: Apr 03 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.