BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated April 24, 2025

Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

Roosevelt Homes Phase 3 Stormwater Conveyance Improvements Site Directions: 1575 Ames Avenue E, St. Paul, MN 55106 The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work includes, but is not limited to, mobilization and demobilization; safety measures; furnishing, installing, maintaining, and removing erosion control facilities; removal and disposal of existing playground structure and surfacing; cutting and disposing of curb and gutter; cutting and disposal of asphalt pavement; removal of existing concrete sidewalk; soil excavation, disposal, and grading; inlet structures and curb cuts; installation of cast-in-place concrete trench drains; installation of catch basins, drain tile, storm sewer pipes, and connections; installation of concrete sidewalk including within St. Paul right-of-way; storm sewer work within St. Paul right-of-way; installation of chain link fence with concrete curb; installation of boulder gravity wall and associated splash rock; reconstructing asphalt paving; installation of concrete sidewalk; landscaping with plantings and mulch; turf restoration; all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and are not guaranteed. This Work shall be subject to minimum wages and labor standards in accordance with the Minnesota Department of Labor and Industry Prevailing Wages for State Funded Construction Projects for Ramsey County. This project is made possible in part by an Implementation Grant for Stormwater Resilience provided by the Minnesota Pollution Control Agency. The local prevailing wage rates published by the Minnesota Department of Labor and Industry under Minnesota Statutes 2022, Section 177.41 to 177.44 or any succeeding statues shall be the minimum rate paid to workers, laborers, and mechanics on the project. The wage rate requirements are included in the contract documents. Question Deadline 03/20/2025 at 2:00 PM CT Questions will be accepted

Bid Results

Playgrounds / Parks / Athletic Fields

$323,711.00

Public - County

Paving, Site Work

25

13

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
137
Bidding Soon
1,581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

May 1, 2025

Project location map

1575 Ames Ave E, Saint Paul, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.