Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated April 3, 2025
Site work and new construction of an educational facility in Gooding, Idaho. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Question Deadline 03/26/2025 A total project budget has been established at $6,000,000 and includes fees (A/E and CM/GC), commissioning services, contingencies, tests, and other project related expenses. The construction budget has been set at $4,740,000. A complete construction cost estimate and construction schedule will be required following CM/GC's review of the Schematic Design set of drawings and must be updated throughout the construction documents process. The scope of work includes construction management and construction of at least one (1) residential cottage for students to live in while attending school at the Idaho School for the Deaf and the Blind. Funding was originally intended to be for two (2) cottages. It is likely that there will not be enough in the budget to build two (2) buildings. Providing the infrastructure to support a future building may become part of this scope of work. The school serves students from across the state. Current enrollment at the school is near and all-time high, and as a result, the number of students who may attend because they live outside the daily bus schedule is capped and a wait list of approximately 10 students is in place. With the addition of the cottage(s), space will be available for more students and therefore meet statutory requirements. The cottage(s) would be used to house high school students, and each would have an occupancy of 12-20 students. Each cottage would consist of individual bedrooms, with shared bathrooms, a large social/lounge area, a smaller study area, a shared dining area, a supervisory office, and a kitchen space. Each cottage would be approximately 10,000 square feet and the structure will be single-story. Currently there are six (6) existing cottages, the most recent built in 1987, that serve a similar purpose. Each of the current cottages have six (6) rooms each, with each room sharing a bathroom with the adjoining room. There are two living/lounge areas, a supervisor's office, a dining area, and a fully equipped kitchen. Designing and building a residential space for students at a school for the Deaf and Blind or those with Low Vision requires an inclusive and comprehensive approach that addresses the needs of both groups. It should prioritize visual, auditory, and tactile accessibility, orientation and mobility/communication, technology integration and ensuring safety, independence, and social interaction. By addressing these needs, residential schools can create an environment that empowers all students and supports their academic and personal growth.
Post-Bid
Educational
$4,740,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2025
August 4, 2025
1450 Main St, Gooding, ID
Related To This Project
Gooding, ID
Bid Date: Dec 18 2025
Gooding, ID
--
Gooding, ID
Bid Date: Apr 29 2025
Gooding, ID
Bid Date: May 22 2025
Gooding, ID
Bid Date: Jun 25 2025
Gooding, ID
Bid Date: Jun 26 2025
Gooding, ID
Bid Date: Aug 27 2025
Gooding, ID
Bid Date: Mar 17 2025
Gooding, ID
Bid Date: Mar 11 2025
Gooding, ID
Bid Date: Feb 26 2025
Gooding, ID
Bid Date: Oct 18 2024
Gooding, ID
Bid Date: Oct 18 2024
Gooding, ID
Bid Date: Sep 25 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
