Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated April 2, 2025
This is a service / maintenance or supply contract in Redway, California. Contact the soliciting agency for additional information.
Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to perform paving services at the Eel River Conservation Camp. This contract requires Prevailing Wages if the total bid amount exceeds $1,000.00. If the total bid amount is under $1,000.00, then Prevailing Wage language will be removed prior to award. Refer to Sample Standard Agreement, for requirement details. In the opinion of California Department of Forestry and Fire Protection (CAL FIRE), this IFB is complete and without need of explanation. Potential Bidders who attended the mandatory pre-bid walk-through may submit written questions regarding the bid by March 19, 2025. All questions should be emailed in writing to Derek.Fergason@fire.ca.gov. NO QUESTIONS will be entertained after March 19, 2025. Bidder must have, at time of bid submittal and for the duration of the contract, a valid, current (A-General Engineering Contractor or C-12 Earthwork and Paving Contractor) license issued by the Contractors State License Board (CSLB), for the type of work to be performed. Bidder shall obtain, pay for and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by CAL FIRE (reference Business and Professions Code Section 7028.15). Payment Bond (STD 807) Requirement: If the successful bidder's bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the CAL FIRE representative not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies CAL FIRE may have. Inadequate or lack of a Payment Bond does not negate the Contractor's obligations under this Agreement. Start Date 06/01/2025 End Date 05/31/2025
Post-Bid
Sidewalks / Parking Lot
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
June 1, 2025
850 Eel River Cp Rd, Redway, CA
Related To This Project
Redway, CA
Bid Date: May 20 2025
Redway, CA
Bid Date: May 20 2025
Redway, CA
Bid Date: May 29 2025
Redway, CA
Bid Date: Jul 31 2025
Redway, CA
Bid Date: Oct 07 2025
Redway, CA
Bid Date: Feb 04 2025
Redway, CA
Bid Date: Nov 05 2024
Redway, CA
Bid Date: Oct 01 2024
Redway, CA
Bid Date: May 01 2024
Redway, CA
Bid Date: Dec 13 2023
Redway, CA
Bid Date: Mar 16 2022
Redway, CA
Bid Date: Feb 08 2022
Redway, CA
Bid Date: Sep 13 2023
Redway, CA
Bid Date: May 02 2022
Redway, CA
Bid Date: Dec 13 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
