BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Beaverton, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work to be done under this Contract consists of the following in Washington County: Construct roadway improvements including aggregate base, ACP asphalt, curbs, concrete sidewalks and driveways. Install, maintain, and remove temporary traffic control and erosion control measures. Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is $100,000 - $300,000. Contact Information Kira Furby Engineering Associate 1400 SW Walnut St. MS 18 Hillsboro, OR 97123 Email: kira_furby@co.washington.or.us Phone: (503) 969-7990 Question Deadline 03/21/2025 at 5:00 PM PT Submit questions only in writing on the County's online Procurement with the Question/Answer feature on the project page. A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$173,999.00

Public - County

Paving, Site Work

17

13

10

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
76
Bidding Soon
909
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 25, 2025

Project location map

SW Miller Hill Rd, Beaverton, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.