Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 14, 2026

Site work and new construction of a mixed-use development in Beaverton, Oregon. Completed plans call for the construction of a 13,150-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.

This bid package covers the complete scope for specification section 09 72 00 -1 WALL COVERINGS as outlined in the attached ASI 10 revised specification. Work includes supply and installation of a complete wall covering package including, submission of product data, shop drawings, and samples per project documents. Project Description: Replace the existing Beaverton School District Transportation Maintenance Facility with a new 13,000 SF single-level building. Relocate propane fueling station. Add stormwater controlling detention pond, replace fencing and make improvements at the site entrance. Schedule: 3/30/2026 - 1/15/2027 Send all bids and questions to bids@robcon.com Addendum A-D have been issued as of 2-13-2026. Addendum 1 has been issued as of 2-9-2026. Prevailing Wage Project and should be based on the current January 2026 BOLI wage rates. Clarifications: o Removed the Pelican HVAC Upgrade Plans dated 9/24/2025 from the bid documents. Bidders need to contact Pelican direct for pricing based on the current drawings and specifications. o Please pay special attention to the OCIP manual and requirements. All subcontractors are required to enroll and participate in this Owner provided insurance program. Please make sure insurance costs are removed from your bid unless you are listed as an excluded party under Project Definitions section in the OCIP manual. o PEMB drawings have been added to the bid documents. Please note these are preliminary permit-set drawings and are not final. While the overall structure will remain unchanged, revisions are forthcoming to the wall panel colors, gutter details, and connection methods for door and window jambs. Please note an embed is going to be added to the top of the CMU wall for attachment of the jambs and base of wall girts. This will require welding the jamb and base girt to the embed for attachment rather then using a mechanical anchor. This cost needs to be included in the erection number. o Also note the stainless steel SMF -5 foundation insulation flashing will be provided by the PEMB manufacturer and installed by the PEMB erector. These are shown on A4.30 and A4.32 at the base of walls. o Utility contractor to provide pipe adaptor at rain drain connections to transition from round below grade pipe to rectangular downspouts.

Post-Bid

Municipal

$1,000,000.00

Public - City

New Construction, Site Work

146

41

265

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
57
Bidding Soon
1,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

December 7, 2026

Project location map

10420 SW Allen Blvd, Beaverton, OR

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed