Site work for a water / sewer project in Beaverton, Oregon. Completed plans call for site work for a water / sewer project.

This project will replace approximately 1,700 feet of 6-inch cast iron water main, originally installed in 1965, with seismically resilient 6-inch ductile iron pipe. The existing cast iron main has experienced several breaks in recent years, exacerbated by corrosive native soils, leading to a significantly shortened service life of both the pipe and fittings. Recognized as a top replacement priority by Water Operations staff, this project will also include: Replacement of all water service lines between the main and meter Installation of Advanced Metering Infrastructure (AMI) meters Replacement of all fire hydrants within the project limits The existing 6-inch cast iron water main, installed in 1965, has deteriorated significantly due to corrosive native soils and has experienced frequent breaks in recent years. These failures have led to costly emergency repairs, water service disruptions, and increased maintenance efforts, impacting both operational efficiency and customer reliability. Recognizing these challenges, Water Operations staff have designated this main as a top priority for replacement. Upgrading to a seismically resilient 6-inch ductile iron pipe will enhance system durability, reduce the risk of future failures, and improve long-term performance in seismic events or shifting ground conditions. Beyond replacing the mainline infrastructure, this project will also modernize the system by: Upgrading all water service lines between the main and meter Installing Advanced Metering Infrastructure (AMI) meters for improved data accuracy and efficiency Replacing all fire hydrants within the project limits to strengthen emergency response capabilities By addressing these issues comprehensively, this project will reduce maintenance costs, improve service reliability, and enhance resilience against seismic activity, ensuring a more sustainable and efficient water system for the community. Last Day to Submit Questions:May 29, 2025, 5:00pm Question Response Deadline:June 2, 2025, 5:00pm The project cost is approximately between $ 1,100,000 and $ 1,300,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results : Schedule A - General Civilworks NW.. Inc. $238,300.00 Schedule B - Water TURNEY EXCAVATING INC. $535,156.00

Award

Water / Sewer

$773,456.00

Public - City

Site Work

34

13

36

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
64
Bidding Soon
945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

August 1, 2025

Project location map

SW Lisa Ln, Beaverton, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.