BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Renovation of a municipal facility in Edmonton, Alberta. Conceptual plans call for the renovation of a municipal facility.

The JG O'Donoghue Building has a configurable set of boardrooms (three rooms with removeable walls) with an integrated audio-visual system which will allow independent boardroom operations or can be switched to a large room with a common audio-visual display across all three rooms. The original room configuration and design was completed in 2017 using systems and software that were available at the time. The Government of Alberta has started migrating its boardroom audio-visual systems from a Cisco based system (as installed in 2017) to a Microsoft TEAMs based system. This project will modernize the software and hardware systems in the rooms to enhance operations and training capabilities of the space. The modernization will align how the multipurpose room(s) operates with the other meeting rooms in JG O' Donoghue. Specifically, users will bring their own mobile devices to the room and through a simple plug in, will be able to conduct TEAMs meetings and share content with meeting participants. a) Project Background - The Multipurpose boardroom in JG O'Donoghue Building was installed in 2017. The original design provided split-combined multi room audio-visual system incorporating Cisco Video Conference components in addition to networked IT displays for desktop/laptop display of team documents. The Government of Alberta has migrated away from Cisco for its video conference systems and is now using Microsoft Teams Room Compute conferencing. b) Project Objectives- To update the equipment and software in JGO Multipurpose multi room 2221, 2226, 2227 video conferencing room, 3 boardrooms with split combined functionality. Defective AV equipment and older Cisco conferencing system will be removed and replaced with Microsoft Teams Room Compute conferencing codecs and audio and video equipment. Existing boardroom PCs would be removed and replaced with a per room HDMI connection for clients to bring in a computer or representation source that has a HDMI input compatibility. If it is in good condition, the project should use as much of the existing wiring and current components as is reasonable to provide a functional system that will be operational for at least the next 5 years. The project proposal should include options for a Service Agreement with the Proponent for a multi-year contract to support troubleshooting, repairing and maintaining the room systems.

Project Abandoned

Municipal

$100,000.00

Public - State/Provincial

Renovation

20

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
21
Bidding Soon
574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

April 14, 2025

Project location map

7000 113 St, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.