Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 13, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a residential development in Rock Island, Illinois. Completed plans call for the renovation of a residential development.
The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located at 1115 38 th Street. This owner-occupied property will be undergoing rehabilitation using Housing and Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Remove existing 40-gallon gas fired water heater. Install new High Efficiency 40-gallon gas fired water heater, do not use Richmond brand. This may require a short unit to be installed measure the floor to ceiling height to ensure proper clearances. Turn the new unit so that the front of the water heater is accessible. Replace the old brass inline shut off valve on gas line with new inline shut off. Install an approved TPRV line no less the 6" from the floor. Make sure the PVC flue has proper slope from the exterior. All penetrations need to be sealed with and exterior grade caulk. Any insulation removed in the joist pocket must be installed after pipping is completed. Electrical outlet will need to be installed for this unit. Water Heater must be lit and operational at the proper temps before leaving. Remove all the existing gas pipe in the house. Install new black iron pipe to waterheater, furnace, and the dryer in the basement. Add a line to the stove on first floor then cap it. All appliances shall have new inline shut-offs installed. Plumbing permit is required before work starts. Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged. All questions shall be directed to the Construction Officer at 309-732-2906. The primary contact person for this project is the City's Construction Officer. Jeff Laxton CED Department 1528 3rd Avenue Rock Island, IL 61201 309-732-2906 laxton.jeff@rigov.org. Bid date notes: Each bid must be submitted on paper and delivered in a sealed envelope. Said envelope shall be clearly labeled with "ENCLOSED: 1115 38 th Street." The bid must clearly address all requirements as described above. The cost of the work must be separated into line items with individual costs in addition to providing a total project cost. Labor costs and material costs must be clearly delineated. The company name, federal tax ID number, Duns number, contact person, email, phone number, and a date with signature are all required as well.
Bid Results
Residential Subdivision
$6,900.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 10, 2025

1115 38th St, Rock Island, IL
Related To This Project
Rock Island, IL
--
Rock Island, IL
Bid Date: Mar 20 2025
Rock Island, IL
Bid Date: Mar 25 2025
Rock Island, IL
Bid Date: Apr 09 2025
Rock Island, IL
--
Rock Island, IL
Bid Date: Apr 16 2025
Rock Island, IL
Bid Date: Apr 30 2025
Rock Island, IL
Bid Date: Mar 31 2025
Rock Island, IL
Bid Date: Apr 14 2025
Rock Island, IL
Bid Date: Mar 13 2025
Rock Island, IL
Bid Date: Feb 28 2025
Rock Island, IL
Bid Date: Mar 04 2025
Rock Island, IL
Bid Date: Mar 04 2025
Rock Island, IL
Bid Date: Feb 28 2025
Rock Island, IL
Bid Date: Feb 25 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.