Published June 16, 2025 at 8:00 PM

Updated June 19, 2025

Demolition, site work, new construction and renovation of a water / sewer project in Yucaipa, California. Working plans call for the construction of a water / sewer project; for site work for a water / sewer project; for the demolition of a water / sewer project; and for the renovation of a water / sewer project.

**As June 16,2025 bids received were rejected as they were over the budget. Project will be rebid but no definite date yet.** DESCRIPTION OF WORK: The Work includes the provision of all equipment, labor, and materials necessary to complete the construction of the following, as specified and shown in the Construction Documents: - Two (2) 95 feet diameter wastewater treatment activated sludge clarifiers (secondary clarifiers), above grade return activated sludge/waste activated sludge pump station with sunshade, submersible scum pump station, submersible drain pump station, concrete masonry block electrical building, associated site work, associated piping facilities, and associated electrical power distribution and control facilities. - Modifications to existing secondary wastewater treatment aeration tank influent and effluent channels, including structural modifications and installation of adjustable weir gates. - Modifications to existing wastewater mixed liquor/activated sludge return splitter box. - Demolition and removal of one (1) 60 feet diameter secondary clarifier and associated piping, electrical, and ancillary facilities. Request for interpretations of the Contract Documents shall be submitted to the Owner not later than March 25, 2025. Bids must comply with all requirements associated with this funding source, including, but not limited to, Davis-Bacon and Related Acts compliance, Equal Employment Opportunity compliance, EPA Disadvantaged Business Enterprises (DBEs) compliance, and American Iron and Steel (AIS). Bidders shall make good faith efforts to use certified DBEs in accordance with the EPA's six good faith effort requirements. Bidders shall advertise for DBEs in accordance with the EPA's six good faith effort requirements and the Special Conditions of this Specification The estimated construction cost is $15,000,000 to $17,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Request for interpretations of the Contract Documents shall be submitted to the Owner not later than April 11, 2025. Therefore, Bidder questions submitted after April 11, 2025 are not and will not be responded to as per ADDA 8 (updated as per ADDA 4)

Final Planning

Water / Sewer

$17,000,000.00

Public - County

Demolition, New Construction, Renovation, Site Work

1

1

233

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
218
Bidding Soon
2,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

December 16, 2025

Project location map

880 W County Line Rd, Yucaipa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.