BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a playground / park / athletic field in Salisbury, North Carolina. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The City of Salisbury is seeking a firm with experience in the design and construction administration of park restrooms for government entities. Scope of Services The selected firm will be responsible for the following tasks: Site Assessment and Feasibility Study: -Conduct a detailed site assessment of the proposed restroom location within City Park. -Analyze the feasibility of the project, considering environmental, regulatory, and logistical factors such as site access, utilities, and ADA compliance. Design Development: -Develop detailed architectural, mechanical, electrical, and plumbing (MEP) designs for the restroom facility. -Ensure the design incorporates durable, vandal resistant materials, low maintenance fixtures, and sustainable practices. -Plan for any site modifications and utility connections -Ensure full compliance with local, state, and federal regulations, including ADA requirements and stormwater management Permitting and Approvals: -Provide support for all required permit applications. -Coordinate with relevant authorities to secure necessary approvals, including building permits, zoning permits and any environmental permits. Construction Documentation: -Provide detailed construction drawings, material specifications, and equipment lists. -Develop a construction phasing plan to minimize disruption to park operations and visitor access. Construction Management: -Manage the entire construction process, including scheduling, budgeting, and procurement of materials. -Oversee all onsite construction activities, ensuring the work adheres to the approved design, quality standards, and project timeline. -Coordinate with contractors, suppliers, and City staff to ensure smooth execution of the project. -Implement safety protocols, including site security measures, to protect workers and the public. -Address any construction related issues or change orders that arise, adjusting as needed to keep the project on track. -Provide regular progress reports to City staff and ensure all work is completed to the City's satisfaction. Post Construction Support -Conduct a final inspection with the City and address any punch list items before final project acceptance. -Provide as built documentation, including warranties and maintenance manuals. -Offer post construction support during the warranty period to address any defects or issues. Responses Provided to Questions March 20, 2025 The Project(s) consist of 446 sf new construction for Park Restroom Facility at both Park Sites - Kelsey Scott and City Park. Typical new construction consists of load bearing masonry with wood trusses. Construction includes split face CMU exterior, CMU interior partition walls, metal panel ceilings and standing seam metal roof system. Base bid work also includes associated site grading; water and sewer utility work; sidewalks; landscaping (re-seed / grassing). General Construction work includes major subcontractors: Site Civil Utility work. Plumbing work. HVAC work. Question Deadline 04/24/2026 Every request for such interpretation or clarification shall be in writing addressed to the Architect, RAMSAY BURGIN SMITH ARCHITECTS, INC., 225 North Main Street, Suite 501, Salisbury, North Carolina 28144. Electrical work.

Post-Bid

Playgrounds / Parks / Athletic Fields

$50,000.00

Public - City

New Construction, Site Work

15

19

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
118
Bidding Soon
2,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

Multiple Locations, Salisbury, NC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.