Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Renovation of a municipal facility in Waukesha, Wisconsin. Working plans call for the renovation of a municipal facility.
As of July 23, 2025. Bids were rejected. No definite date for the rebid. The project involves the removal of LBP from the exterior of the building as necessary to complete the scope of work. The contractor shall remove lead-based paint from all exterior columns coated with white LBP; these components are to be repainted. In addition, all brown LBP on the exterior walls of the building shall be removed prior to repainting. All lead-based paint disturbance, removal, or abatement shall be the responsibility of the Contractor and shall be performed by a company and personnel who are properly certified and trained in accordance with applicable federal and state regulations, including the U.S. Environmental Protection Agency (EPA) rules and Wisconsin Department of Health Services (DHS) requirements. Any materials coated with LBP that are removed must be handled and disposed of in accordance with applicable Wisconsin Department of Natural Resources (WDNR) and DHS regulations. All waste generated during LBP removal, including paint residues, cleaning materials, and containment debris must be properly characterized, managed, and disposed of by certified personnel with the appropriate health and safety training. The contractor is responsible for ensuring that all work involving LBP is conducted in compliance with applicable regulations and that all waste is properly handled and disposed. It is the contractor's responsibility to determine whether notification is required under Wisconsin Administrative Code NR 447 for demolition or renovation activities and, if required, to submit notification to WDNR at least 10 working days prior to the start of work. No asbestos testing has been completed as part of this project, any required testing would be at the contractor's expense. Removing Existing Lead-Based Paint Painting Replacing Wood Pedestal Boards Replacing Stage Boards Joint Caulking Roof, Fascia, and Soffit Improvements Bids get rejected.
Final Planning
Municipal
$304,048.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2025
January 23, 2026
321 Wisconsin Ave, Waukesha, WI
Related To This Project
Waukesha, WI
Bid Date: Aug 29 2025
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
Bid Date: Apr 11 2025
Waukesha, WI
Bid Date: Jun 14 2019
Waukesha, WI
Bid Date: Jun 14 2019
Waukesha, WI
Bid Date: May 22 2025
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
