EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Carlisle, Iowa. Completed plans call for site work for a stadium; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project consists of the combined construction of grandstand ADA improvements at the High School Stadium home side grandstand. Improvements include new grandstand structure, ramping, and associated sitework and retaining wall at 430 School Street, Carlisle, Iowa. The project includes all General Work. Doc Note - Bidders may obtain Bidding Documents at the office of the Printer, Action Reprographics, 5037 NE 14th Street, Des Moines, Iowa 50313, by calling 515-288-2146 or through their On-line Plan Room from 8:00 AM until 5:00 PM, Monday through Friday, in accord with the Instructions to Bidders. After the award of the Project, return the Documents, in reusable condition, to Action Reprographics. If shipping is required, there will be a non-refundable fee required for each set shipped. The cost shall be determined by Action Reprographics based on the size of the project. Checks for shipping shall be made out to Action Reprographics. Each Bidder shall accompany its bid with bid security in a separate, sealed envelope as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish within ten (10) days after the award of Contract a corporate Surety Bond, in a form acceptable to the Board of Directors of the Carlisle Community School District, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in an amount equal to five percent (5%) of the amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board of Directors of Carlisle Community School District. The bid shall contain no condition except as provided in the specifications. Bid security shall be made payable to Carlisle Community School District. The successful Bidder will be required to furnish within ten (10) days of the award proof of insurance as required by the Bid Documents and a Performance Bond and Labor and Material Payment Bond both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Should the successful bidder fail or neglect to furnish satisfactory performance/payment bonds, refuse to enter into a Contract on the basis of the bid, or fail to meet the requirements of this Notice and the specifications regulating the award, the bidder's security may be retained as liquidated damages. No bidder may withdraw its bid for a period of sixty (60) calendar days after the date and hour set for opening of bids. Work on the Project shall commence as soon as possible after award of the Contract and is scheduled for a substantial completion date on or before August 22, 2025, with Final Acceptance to be no later than sixty (60) days after substantial completion. The right is reserved to reject any or all bids, or any part thereof, and to waive informalities as allowed by law, and to enter into such contract or contracts as shall be deemed in the best interests of Carlisle Community School District. Question deadline - 4 April 2025

GC Bidding

Sidewalks / Parking Lot

$450,000.00

Public - City

Paving, Site Work

8

13

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Tiling
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Grandstands and Bleachers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Site Improvements, Retaining Walls, Segmental Retaining Walls, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
499
All Active Projects
285
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

img_map_placeholder

430 School St, Carlisle, IA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Carlisle High School Stadium Grandstand ADA Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.