Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Site work, paving, outdoor lighting and new construction of a mixed-use development in Waukesha, Wisconsin. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Cardinal Ridge Park: Development will be planned in phases based upon the adopted Park Master Plan. Currently used as a fill site, first phase improvements would include mass grading and access enhancement (turn lanes, a driveway and parking lot, etc.) and utilities stubbed out to accommodate future phases. Riverwalk Plaza: The Riverwalk Plaza is possible in part through a partnership with the developer of The Riverfront. The Plaza will be an entertainment and destination area, drawing patrons to the Downtown. Meadowview Community Park (Meadowbrook & Northview Roads): The park has experienced phased development since 2017. The following items have been completed: grading biofilter areas, mass grading of the park, installation of an asphalt pathway and the east parking lot, seeding of the lawn and native grass areas, parking lot and pathway lighting, stubbing out of utilities such as electric, sanitary and water, installation of a small footbridge, installation of a playground through the use of community build, planting of trees, establishing the lawn and native prairie areas, cleaning the west tree line of dead and invasive trees, and demolition of the old fire station building Proposed for 2025: Construction of a park pavilion building with restrooms, kitchen/concessions and rentable indoor and outdoor room/spaces. In addition to the pavilion facility, construction of a splashpad ("sprayground") is proposed (highly requested). Further, the existing parking lot would be expanded. Missile Park: A revised master plan is needed to best identify park improvements incorporating the Rempe property acquisition. The original master plan included the first public disc golf course in the city, along with a shelter with restrooms and a playground Skyline Neighborhood: An open air shelter with a playground and some minor landscaping. A trail system will wind throughout the neighborhood. As of March 13, 2025, this project is included in the city's 2025-2029 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. Funding is allotted for FY 2026-2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$3,776,000.00
Public - City
New Construction, Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
Multiple Locations, Waukesha, WI
Related To This Project
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
Bid Date: May 16 2025
Waukesha, WI
Bid Date: Aug 29 2025
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
Bid Date: Mar 28 2025
Waukesha, WI
Bid Date: Apr 11 2025
Waukesha, WI
Bid Date: Jun 14 2019
Waukesha, WI
Bid Date: Jun 14 2019
Waukesha, WI
Bid Date: Mar 12 2025
Waukesha, WI
Bid Date: Mar 19 2025
Waukesha, WI
Bid Date: Mar 12 2025
Waukesha, WI
--
Waukesha, WI
Bid Date: Mar 12 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.