Published March 21, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a water / sewer project in Decatur, Illinois. Completed plans call for the renovation of a water / sewer project.
Remove and dispose of two (2) 120' final clarifier mechanisms (10 and 12) and procuring and installing three (3) new 120' final clarifier mechanisms (clarifier tanks 10, 11, and 12), platforms, and scum troughs and scum beach plates. Prior to installation of the clarifier 11 mechanism, the contractor will be responsible for removal and replacement of the existing clarifier floor and 20 feet of damaged feed and drain line piping. Existing walkways to the center structures of the clarifiers are being reused. The contractor will sandblast, paint and coat with UV resistant paint. There will be miscellaneous underwater paint required for existing piping not being replaced. Scum beach plates and scum troughs will be removed and replaced with new on all three clarifiers. The distribution structure feeding the final clarifiers has painted carbon steel baffling that needs to be replaced. The contractor will remove baffling and purchase and install new 316 stainless steel distribution baffling and miscellaneous baffling throughout the structure. There are 23 gates in the aeration tanks and effluent channels that are being rehabilitated in this contract. The existing gate slides are being removed and disposed. The contractor will procure new slides, repair pitting on embedded gate frames, replace existing seals, and install and commission new sealed gate systems and remove existing electrical actuators. There are 4 additional clarifiers that steel and internal mechanisms are only being removed from the inside of the structures.
GC Bidding
Water / Sewer
$70,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
501 S Dipper Ln, Decatur, IL
Related To This Project
Decatur, IL
Bid Date: Mar 24 2025
Decatur, IL
Bid Date: Mar 24 2025
Decatur, IL
Bid Date: Mar 24 2025
Decatur, IL
Bid Date: Apr 15 2025
Decatur, IL
Bid Date: Apr 15 2025
Decatur, IL
Bid Date: Mar 27 2025
Decatur, IL
Bid Date: Apr 01 2025
Decatur, IL
Bid Date: Apr 17 2025
Decatur, IL
Bid Date: Mar 20 2025
Decatur, IL
Bid Date: Mar 21 2025
Decatur, IL
Bid Date: Jul 25 2019
Decatur, IL
Bid Date: Feb 21 2025
Decatur, IL
Bid Date: Mar 26 2025
Decatur, IL
Bid Date: Mar 07 2025
Decatur, IL
Bid Date: Jan 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
2025 WWTP Upgrades - South Final Clarifiers, Aeration/Channel Gates
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.