BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work and renovation of a mixed-use development in Schenectady, New York. Completed plans call for the renovation of a educational facility; for site work for a educational facility; playground / park / athletic field; playground / park / athletic field; pre-engineered storage facility; and pre-engineered storage facility.

Work in the Site Contract includes, but is not limited to, the following 1. All General Provisions of the Contract 2. All work noted in Division 1 of the specifications 3. All Site work, excavation, backfill, import and export of fills, compaction, structural fills, retaining walls, underground piping systems complete, pavements and sub bases (asphalt and concrete) from building perimeter to property lines as noted or required in order to provide a complete project. Building pad elevations will be set to the required elevations as noted on the drawings as sub grade below crushed stone fill supporting the Slabs on grade under this contract. 4. All utilities (other than electric and data) will be provided under this contract to within 5-feet of new building footprints. 5. All excavation and backfill required outside the building footprint plus 10'. 6. All water, storm sewer, sanitary water and municipal tie-is shown or required 7. All pavements and hard surfaces noted 8. All plantings and maintenance as noted 9. All restorations and seeding 10. All daily final cleaning of site and roads as required 11. Legal and proper deposal of all excess materials no longer required 12. Permanent fencing and gates as noted on site drawings 13. Final cleaning of site and improvements as defined by contract limit lines with exception to area inside building footprint. 2023 CAPITAL PROJECT PACKAGE 3 53-05-15-06-0-007-016 (DRAPER MIDDLE SCHOOL) 2023 CAPITAL PROJECT PACKAGE 3 53-05-15-06-7-016-001 (PRESS BOX) Plans call for the renovations and site work for the Rotterdam-Mohonasen Central School District. The scope of this project includes but is not limited to: Site Work Construction, General Construction, Plumbing Construction, Mechanical Construction, Electrical Construction. As of March 17th, 2025, a construction manager has been identified. Construction is expected to begin in April 2025.

Post-Bid

Educational

$11,200,000.00

Public - City

Renovation, Site Work

175

32

33

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
181
Bidding Soon
2,051
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 3, 2025

Project location map

2072 Curry Rd, Schenectady, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.