BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work and asbestos abatement for a conference / convention center in Gaffney, South Carolina. Completed plans call for the demolition of a conference / convention center; for site work for a conference / convention center; and for asbestos abatement for a conference / convention center.

-Demo interior of structure on main floor back to brick walls, and original tongue and grove ceiling. -Demo all interior Walls except walls marked in Red on page 4 of attached drawings. -When interior wall joins exterior wall, the entire wall should be demolished back to a clean finish of the exterior wall. -Center main wall has archways. These walls will be taken back to original form. -Demo all drop ceilings on top floor. -Demo all framed ceilings located above the drop ceiling. -This included the framing and supports. -When complete with ceiling demo should be open back to original bead board ceilings. -Demo all carpet flooring, tile flooring in bathrooms. See abatement of asbestos below -Abate all Asbestos as follows. This must be performed by an asbestos licensed contractor and follow all state and federal regulations. -Base bid to include 2000 square feet and also give a per square foot price for any overage of underage's the base bid for flooring under carpet. -Bid to include flooring in safe area (approx. 600 sf) that needs to be abated. -TSI Piping in basement approx. 500 sf -TSI Aircell piping in basement approx. 200 sf -Demo all mechanical, electrical, and plumping. -Plumbing demo back to agree location under the main floor -Electrical demo back to electrical panel -Mechanical to be completely removed -Roof penetrations will be removed, and roof repair will performed in conjunction with the owner and the owner will be responsible for any cost of the roof repair. -Remove any cabinetry inside the structure. -Concrete safe to be removed (floor, walls, and ceiling) Subfloor to be installed to cover hole in floor after demolition -Black safe door when removed will be retained by the owner. -Contractor is responsible for removing and disposing of all material in the proper manner required by state standards. -Contractor will be giving a designated lay down area on the side of the building. -Contractor is responsible for all cost of permits and business license. -Contractor will have to meet all city insurance requirements (see attached) -Contractor will stipulate time schedule for project in bid proposal. The City reserves the right to reject any and all bids and to waive all technicalities.

Post-Bid

Conference / Convention Centers

$200,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

22

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
124
Bidding Soon
1,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

Project location map

100 Railroad Ave, Gaffney, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.