BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Site work for a road / highway in Bettendorf, Iowa. Completed plans call for site work for a road / highway.

The proposed improvements consist of painting pavement markings on various streets throughout the City. The markings include edge lines, centerlines, barrier lines, double yellow lines, turn lane lines at intersections, crosswalks, and symbols. All work on this contract shall be completed in two applications. The first application shall start on or after April 2, 2025 and be completed by July 15, 2025. The second application shall start on or after September 15, 2025 and be completed by November 15, 2025. The first application includes all lane lines, symbols and crosswalks. The second application will only include the lane lines. Once started, the contractor shall have 45 working days to complete the first application and 20 working days for the second application. Both applications must be completed by the completion dates listed above, regardless of remaining working days. The beginning and completion dates will be included in and made part of the contract between the successful bidder and the City. Liquidated damages in the amount of Five Hundred Dollars and no/100 ($500.00) per calendar day shall be charged for every day past the completion date.

Award

Roads / Highways

$600,000.00

Public - City

Site Work

3

9

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
47
Bidding Soon
1,210
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 2, 2025

Project location map

Multiple Locations, Bettendorf, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.