BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Demolition, site work and new construction of a water / sewer project in Towanda, Pennsylvania. Completed plans call for the demolition of a 1,628-square-foot, one-story above grade water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Contract 2025-1: General/Mechanical Work & Contract 2025-3: Electrical Work. The Project includes the following Work: Construction of a new Headworks Building, installation of various improvements to the plant's existing digester system, and miscellaneous plant site improvements. Also included is the demolition of the existing Headworks Building and all other appurtenances necessary for the completion of the Work. A certified check or bank draft, payable to the order of the Owner or negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price on the forms provided, with a surety company listed on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania. Contract 2025-1: Gen/Mech $4.8 Million Contract 2025-3: Electrical $1.2 Million The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Document note : All checks should be made payable to Stiffler Payment is non-refundable. A $20.00 mailing fee for postage and handling will be required for Contract Documents that are mailed to bidders. Bid result - General/Mechanical Work - Lobar Inc - $5,590,000.00 Electrical Work - Urban Electrical Contractors,Inc - $1,413,000.00

Award

Water / Sewer

$7,154,600.00

Public - City

Demolition, New Construction, Site Work

221

78

5

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
114
Bidding Soon
1,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

September 12, 2025

Project location map

3 S River St, Towanda, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.