BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 21, 2025

Site work and paving for a civil project in Olympia, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Cooper Rd SW at Mox Chehalis Creek Culvert Replacement Major work items include: Mobilization, Removal of Temporary Bridge & Transportation, Streambed Material, Furnishing Steel Piles, Driving Steel Piles, Cone. Class 4000 for Bridge Abutments, Erect Prefabricated Bridge, and Commercial HMA. Cost estimate range: $450,000 to $525,000. All bid proposals shall be accompanied by a bid proposal deposit in the form of a certified check, cashier's check or surety bond in an amount equal to five percent of the amount of such bid proposal. The contract for the public work shall be awarded to the responsible bidder submitting the lowest responsive bid. The Board of Thurston County Commissioners may waive informalities in the bidding, reject any or all bids for good cause, reject a bid not accompanied by any required bid deposit, republish the call for bids, revise or cancel the work, or require the work to be done in another way if the best interest of Thurston County is served. Technical questions regarding the scope of this project shall be put in. writing and directed to the contact below. Questions by telephone will not be accepted. Thurston County Public Works Attn: Jake Gustafson 9605 Tilley Road S., Suite C Olympia, WA 98512-9140 Jake.gustafson@eo.thurston. wa.us The County of Thurston, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 IJ.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Thurston County is an equal opportunity employer and hereby notifies all bidders that it will affirmatively ensure that all will be afforded full opportunity to submit bids in response to this Call for Bids and will not be discriminated against because of race, color, creed, ethnicity, religion, national origin, age, sex, marital status, veteran or military status, sexual orientation or the presence of any disability. Implementation of this provision shall be consistent with RCW 49.60.400. This project is funded by FEMA federal funds.

Post-Bid

Bridges / Tunnels

$525,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
97
Bidding Soon
1,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Cooper Rd SW, Olympia, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.