Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 14, 2025 at 8:00 PM
Updated March 21, 2025
Site work and paving for a civil project in Olympia, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Cooper Rd SW at Mox Chehalis Creek Culvert Replacement Major work items include: Mobilization, Removal of Temporary Bridge & Transportation, Streambed Material, Furnishing Steel Piles, Driving Steel Piles, Cone. Class 4000 for Bridge Abutments, Erect Prefabricated Bridge, and Commercial HMA. Cost estimate range: $450,000 to $525,000. All bid proposals shall be accompanied by a bid proposal deposit in the form of a certified check, cashier's check or surety bond in an amount equal to five percent of the amount of such bid proposal. The contract for the public work shall be awarded to the responsible bidder submitting the lowest responsive bid. The Board of Thurston County Commissioners may waive informalities in the bidding, reject any or all bids for good cause, reject a bid not accompanied by any required bid deposit, republish the call for bids, revise or cancel the work, or require the work to be done in another way if the best interest of Thurston County is served. Technical questions regarding the scope of this project shall be put in. writing and directed to the contact below. Questions by telephone will not be accepted. Thurston County Public Works Attn: Jake Gustafson 9605 Tilley Road S., Suite C Olympia, WA 98512-9140 Jake.gustafson@eo.thurston. wa.us The County of Thurston, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 IJ.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Thurston County is an equal opportunity employer and hereby notifies all bidders that it will affirmatively ensure that all will be afforded full opportunity to submit bids in response to this Call for Bids and will not be discriminated against because of race, color, creed, ethnicity, religion, national origin, age, sex, marital status, veteran or military status, sexual orientation or the presence of any disability. Implementation of this provision shall be consistent with RCW 49.60.400. This project is funded by FEMA federal funds.
Post-Bid
Bridges / Tunnels
$525,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
April 21, 2025
Cooper Rd SW, Olympia, WA
Related To This Project
Olympia, WA
Bid Date: Apr 01 2025
Olympia, WA
Bid Date: Apr 03 2025
Olympia, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
